BIS Menu  |  Bldg Info Search  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M369147
Premises: 350 BLEECKER STREET MANHATTAN BIN: 1011189     Block: 620   Lot: 19
   
Application Completed and Certified

Filed: 350 BLEECKER ST Census Tract:   73 Health Area:  6400
6TH FOOR Admin Area:   M - MANHATTAN Inspection Area:   R
NEW YORK, NY 10014 Community Board:   102
DOB Cross Street(s):   WEST 10 STREET,    CHARLES STREET
Status:   C - JOB IS SIGNED OFF 10/16/2015
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/23/2015 11:26 PM
Application Entered:   06/23/2015 Job Start Date:   06/25/2015
Last Change:   10/16/2015 Job End Date:   06/22/2016
Appointment Status:   
Last Inspection By:   ELLIS DAVID       On     10/07/2015      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011825 Licensee Name: MICHAEL J SCHMIDT
Firm: 003432 Firm Name: SERENITY ELECTRIC CORP
Firm Phone: 718-381-8200  Firm Address: 246 COOK STREET BROOKLYN NY 11206 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $77.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: CHANA CHENFELD
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  1  200 AMP 1 PHASE PANEL
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 1 #4-Wire 0 #10-Wire 0
Existing Meters 5 + New Meters 1 - Removed Meters 5 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 06/23/2015 Notice:  
Power Issued: 06/23/2015 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  COMBINE 5 EXISTING 40 AMP METER RISERS INTO 1 200 AMP METERAND 1 200 AMP SINGLE PHASE PANEL.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M369147
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/07/2015 10/16/2015 EID C E (1) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Bldg Info Search  |  Electrical Inspection Work Order  |  Back