![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M367139 | ||
| Premises: 1349 2 AVENUE MANHATTAN | BIN: 1043944 Block: 1426 Lot: 21 |
| Printable (PDF) version of this Permit | |||||||||||
| DOB NOW: Inspections | |||||||||||
| Filed: | 1349 SECOND AV | Census Tract: 126 | Health Area: 4200 | |
| GROUND FLOOR | Admin Area: M - MANHATTAN | Inspection Area: K | ||
| NEW YORK, NY 10021 | Community Board: 108 | |||
| Related Job Number: 122359893 | |||
| DOB Cross Street(s): EAST 71 STREET, EAST 72 STREET | |||
| Status: E - ABANDONED 08/22/2025 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 05/08/2015 6:30 AM | |
| Application Entered: 05/08/2015 | Job Start Date: 05/08/2015 | ||
| Last Change: 08/22/2025 | Job End Date: 11/08/2015 | ||
| COMPLETION FEE WAS BILLED | |||
| Appointment Status: | |||
| Last Inspection By: RAMJAG, BUDRAM On 09/09/2015 | |||
| Field Disp: A - OBJCTN ISSD: JOB COMPLETE | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 010346 | Licensee Name: | PHILIP A ROBINSON | |
| Firm: | 001157 | Firm Name: | PHILIP A. ROBINSON | |
| Firm Phone: | 718-783-6542 | Firm Address: | 43-49 10TH STREET.SUITE 107 LONG ISLAND CITY NY 11101-6999 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $180.25 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: SHOWROON | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | ZAHEER AKBER | ||||||
| Owner Business Name: | MANHATTAN CABINETS | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| GND | GND | 50 | 60 | 2 | 15 | 50 | 2 | 14 | ||||
| Buildings Total | 50 | 60 | 2 | 15 | 50 | 14 | ||||||
| Total Units : 191 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | V - OBJECTION(S) EXIST | |
| Power Requested: | Notice: | 1 - FIRST NOTICE 09/15/2015 | |
| Power Issued: | Response: |
| Follow-Up: | |||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 09/09/2015 | 09/15/2015 | BUR | A | (45) | (6) | Y | |||
| INSPECTION COMMENTS: | NONE | |||||||||