BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M365246
Premises: 1262 LEXINGTON AVENUE MANHATTAN BIN: 1047931     Block: 1514   Lot: 16
   
Application Completed and Certified

Filed: 131 E 85 ST Census Tract:   148.01 Health Area:  3600
ROOF Admin Area:   M - MANHATTAN Inspection Area:   J
NEW YORK, NY 10028 Community Board:   108
DOB Cross Street(s):   PARK AVENUE,    LEXINGTON AVENUE
Status:   C - JOB IS SIGNED OFF 05/12/2015
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  03/25/2015 2:03 PM
Application Entered:   03/25/2015 Job Start Date:   03/26/2015
Last Change:   05/12/2015 Job End Date:   03/25/2016
Appointment Status:   
Last Inspection By:   GANITIS, PHILLIP       On     04/03/2015      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011171 Licensee Name: TREVOR DUNWELL
Firm: 002607 Firm Name: APPROVED ELECTRIC CORP.
Firm Phone: 718-882-3145  Firm Address: 3550 WHITE PLAINS ROAD STE #9 BRONX NY 10467 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $220.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: AT&T
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  12  #8
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  FEEDER FOR POWER CABINET FOR CELL SITE EQUIPMENT ON ROOF.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M365246
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 04/03/2015 04/08/2015 PHG C (40) (0) Y
INSPECTION COMMENTS: NONE