Electrical Application Details for App #: M363934
Premises: 40 PECK SLIP MANHATTAN BIN: 1001338     Block: 97   Lot: 31
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 40 PECK SLIP Census Tract:   15.01 Health Area:  7700
GROUND,2ND,3RD&4TH FLOORS Admin Area:   M - MANHATTAN Inspection Area:   W
NEW YORK, NY 10038 Community Board:   101
Special Place Name:   SUPERIOR OFFICERS ASSOCIATION
DOB Cross Street(s):   FRONT STREET,    SOUTH STREET
Status:   C - JOB IS SIGNED OFF 04/27/2018
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  02/20/2015 2:58 PM
Application Entered:   02/20/2015 Job Start Date:   02/20/2015
Last Change:   04/27/2018 Job End Date:   11/30/2015
Appointment Status:   
Last Inspection By:   RACEWICZ, TOMASZ       On     03/01/2018      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 011850 Licensee Name: JAMES P ST. JOHN
Firm: 003455 Firm Name: PATRIOT ELECTRIC CORP
Firm Phone: 718-736-8733  Firm Address: 15-17 126TH STREET 3RD FLOOR COLLEGE POINT NY 11356 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
Total Fee:  $295.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   O - Office Bldg
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: TED O'ROURKE
Owner Business Name: ICS BUILDERS
Authorized Representative:  TED O'ROURKE
Relationship To Owner:   OWNER'S REP.


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  1  400A
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  2  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 1
Existing Meters 0 + New Meters 1 - Removed Meters 0 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 02/20/2015 Notice: C - CALL TO OFFICE 03/28/2017
Power Issued: 02/20/2015 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M363934
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/28/2016 09/29/2016 MQY V (34) (5)
INSPECTION COMMENTS: NO ACCESS TO GEC OR SUPPLEMENTAL. CHECK GROUND AND BONDING
 
(2) 12/01/2016 12/05/2016 PHG H X (44) (0) Y
INSPECTION COMMENTS: ROOF ONLY DID NOT INSPECT BRANCH WIRING
 
(3) 03/28/2017 03/28/2017 CBK J X (50) (0) Y
INSPECTION COMMENTS: OBJECTIONS NOT REMOVED.
 
(4) 03/01/2018 03/02/2018 TOR C R (40) (0)
INSPECTION COMMENTS: PASS.

OBJECTION FOR APPLICATION #: M363934
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (999) OTHER
(GROUND FLOOR)UTILITY MANHOLE COVER IS NOT ACCESSIBLE, STAIRS BUILT DIRECTLY ONMANHOLE COVER (110.73)
RSLV 09/28/2016 09/28/2016 03/01/2018
 
002 (999) OTHER
(ROOF) NEUTRAL BONDED AFTER SS IN PANEL (250.24)
RSLV 09/28/2016 09/28/2016 03/01/2018
 
003 (999) OTHER
(ROOF) MAIN BONDING JUMPER MISSING FROM SS (250.92)(250.24)
RSLV 09/28/2016 09/28/2016 03/01/2018
 
004 (999) OTHER
(ROOF) UTILITY VAULT NOT ACCESSIBLE (BOTTOM STAIR BUILT ON VAULT
RSLV 09/28/2016 09/28/2016 03/01/2018
 
005 (999) OTHER
(ROOF) NEUTRAL BONDING MISSING FROM SS (250.92)
RSLV 09/28/2016 09/28/2016 03/01/2018