| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
1X4 |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
1 |
4X#500 |
| SUB FEEDERS (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
2 |
#2 |
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
4 |
3/0 |
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
5 |
3X200, 2X100 |
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
1 |
25 HP |
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED (ALL FLOORS)MC CABLE AND FMC NOT PROPERLY GND 250.112,118,122 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 002 |
( 36) |
CONDUCTORS ARE NOT PROPERLY COLOR CODED (ALL FLOORS)GREEN WIRE USED AS NEUTRAL AND AS HOT 200.6, 250.119 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 003 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED (ALL FLOORS) SWITCHES AND RECEPTACLE IN COMBUSTIBLE MATERIAL314.20,21 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 004 |
( 59) |
AFCI PROTECTION HAS NOT BEEN PROVIDED (ALL FLOORS) AFCI PROTECTION NOT PER 210.12 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 005 |
(109) |
SUFFICIENT WORK SPACE IS NOT PROVIDED/MAINTAINED (BASEMENT)NO ACCESS TO LED DRIVERS 110.26 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 006 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER (CELLAR) S. SW. NOT BONDED250.24,28 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 007 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (CELLAR) NO GND ROD , BUILDING HAS TWO WATER PIPE 250.50,52 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 008 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED (CELLAR) LFNC IN USE AM. 356.10 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 009 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED (CELLAR)OVERSIZE WIRES IN 100 A CB 110.2,3 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 010 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED (CELLAR)BOILER RM. : MC CONNECTORS NOT APPROVED 110.2,3 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 011 |
( 63) |
RECEPTACLE OUTLETS NOT IN SUFFICIENT NUMBER (CELLAR) ROOM RECEPTACLE NOT PER 210.52 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |
| |
| 012 |
(999) |
OTHER (CELLAR)NO DISC. MEANS PROVIDED FOR SAUNA 424.19 |
RSLV |
09/06/2018 |
09/06/2018 |
02/25/2019 |