Electrical Application Details for App #: M358864
Premises: 86 PARK AVENUE MANHATTAN BIN: 1017595     Block: 869   Lot: 34
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 90 PARK AV Census Tract:   82 Health Area:  5200
E40THST/28TH FLR Admin Area:   M - MANHATTAN Inspection Area:   P
NEW YORK, NY 10016 Community Board:   106
Special Place Name:   VORNADO PRE-BUILT
DOB Cross Street(s):   EAST 39 STREET,    EAST 40 STREET
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  09/22/2014 3:36 PM
Application Entered:   09/22/2014 Job Start Date:   09/23/2014
Last Change:   08/22/2025 Job End Date:   12/01/2014
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:   CONROY BLAKE       On     01/10/2017      
Field Disp:   N - NO ACCESS
Energize Recommendation:  
Objection Disposition:  

License #: 010905 Licensee Name: SOTIRIOS STATHOPOULOS
Firm: 003195 Firm Name: POLO ELECTRIC CORP. D/B/A
Firm Phone: 212-627-8220  Firm Address: 497 CANAL STREET HELLENIC WIRING CONTRACT NEW YORK NY 10013 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $80.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   G - Garage
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: STEVE SONITIS
Owner Business Name: VORNADO REALTY TRUST
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
028    68  22    14  68             
Buildings Total 68  22    14  68                
Total Units : 172 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up:
Contractor's Comments:  OFFICE RENOVATION

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M358864
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/10/2015 07/16/2015 DNM J (15) (0) Y
INSPECTION COMMENTS: JOB STILL IN PROGRESS
 
(2) 01/10/2017 01/10/2017 CBK N (30) (0) Y
INSPECTION COMMENTS: CONTRACTOR DID NOT GET ACCESS TO SPACE.