| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
11 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(229) |
SPLICE BOXES NOT ACCESSIBLE PHF: OLD PANEL LOCATION/SPLICE BOX NOT ACCESSIBLE. 314.29 |
OPEN |
10/01/2014 |
04/16/2015 |
|
| |
| 002 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED 10F,11H,PHF: IMPROPERLY INSTALLED/SIZED BONDING JUMPER BETWEEN OLD/NEW PANELS. 250.102E,TABLE 250.122 |
RSLV |
10/01/2014 |
02/27/2015 |
04/16/2015 |
| |
| 003 |
(999) |
OTHER 0F,11H,PHF: OPENINGS NOT SEALED IN OLD PANEL COVER. 110.2,408.7 |
OPEN |
10/01/2014 |
04/16/2015 |
|
| |
| 004 |
(229) |
SPLICE BOXES NOT ACCESSIBLE SPLICE BOXES NOT ACCESSIBLE,OLD PANEL LOCATION SPLICE BOX NOTACCESSIBLE.. 314.29 |
OPEN |
02/27/2015 |
04/16/2015 |
|
| |
| 005 |
(999) |
OTHER SPLICE BX NOT ACCESSIBLE NO SUFFICIENT ACCESS & WORKING SPACE PROVFOR ALL OLD PNLS WHICH ARE BEING USED AS SPLICE BX 110.26 31429 |
OPEN |
04/16/2015 |
04/16/2015 |
|