| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
400 AMPS |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
21 |
20 APT 1 PLP |
| B. Over #2 to 1/0 |
1 |
|
| C. Over 1/0 to 250 MCM |
1 |
|
| D. Over 250 MCM |
2 |
TO SW, TO METERBANK |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
1 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER BSMT: NO INTER SYSTEM GR.BAR.. 250.94 |
OPEN |
09/28/2015 |
09/28/2015 |
|
| |
| 002 |
(280) |
MAIN BONDING JUMPER IS DEFECTIVE BSMNT: NOT AS PER 250.66 |
OPEN |
09/28/2015 |
09/28/2015 |
|
| |
| 003 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER BSMNT: COLLECTOR BAR250.66 |
OPEN |
09/28/2015 |
09/28/2015 |
|
| |
| 004 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED BSMNT: E.G.C.BETWEEN METER B.TERM.BOX & 60A PLP DISC NOT AS PER250.66 |
OPEN |
09/28/2015 |
09/28/2015 |
|
| |
| 005 |
(999) |
OTHER BSMNT: OPENINGS NOT FIRE PROOFED.. 300.21 |
OPEN |
09/28/2015 |
09/28/2015 |
|
| |
| 006 |
(999) |
OTHER BSMNT: GEC CONDUIT NOT CONTINUOUS.. 250.66(E) |
OPEN |
09/28/2015 |
09/28/2015 |
|
| |
| 007 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED BSMNT: 5" X 5" OLD FUSE BOS WITH DOOR BELL IN HALLWAY |
OPEN |
09/28/2015 |
09/28/2015 |
|
| |
| 008 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED BSMNT: 8" X 8" NEW SPLICE BOXES(3)IN HALLWAY.. 250.8 |
OPEN |
09/28/2015 |
09/28/2015 |
|
| |
| 009 |
(999) |
OTHER BASE: G.E.C.CONDUIT NOT CONTINUOUS.. 250.24(A)(4) |
OPEN |
09/28/2015 |