Electrical Application Details for App #: M354926
Premises: 1200 5 AVENUE MANHATTAN BIN: 1051486     Block: 1607   Lot: 7501
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 1200 5 AV Census Tract:   168 Health Area:  2810
SIDEWALK Admin Area:   M - MANHATTAN Inspection Area:   J
NEW YORK, NY 10029 Community Board:   111
DOB Cross Street(s):   EAST 101 STREET,    CENTRAL PARK ENTRANCE E 102 ST
Status:   C - JOB IS SIGNED OFF 10/31/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/15/2014 12:51 PM
Application Entered:   06/15/2014 Job Start Date:   06/15/2014
Last Change:   10/31/2017 Job End Date:   06/15/2015
Appointment Status:   
Last Inspection By:   GARY MCCALLA       On     10/13/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010765 Licensee Name: CESAR QUERY
Firm: 002004 Firm Name: C.Q. ELECTR'L CONTRG CORP
Firm Phone: 718-204-9255  Firm Address: 723 EAST 135TH STREET BRONX NY 10454 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $57.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: KHANNA STAYEDER
Owner Business Name: KHANNA DEFINED PLAN
Authorized Representative:  TONY MAMOUNAS
Relationship To Owner:   CONSTRUCTION MANAGER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
SWK  SWK  40        40             
Buildings Total 40        40                
Total Units : 80 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  DOB-2K14-049 SIDEWALK SHED

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M354926
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/13/2017 10/16/2017 GYM C (35) (0) Y
INSPECTION COMMENTS: NO SHED IN FRONT.