BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M351745
Premises: 227 CHERRY STREET MANHATTAN BIN: 1003203     Block: 248   Lot: 1
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 227 CHERRY ST Census Tract:   6 Health Area:  7800
GRD FL Admin Area:   M - MANHATTAN Inspection Area:   V
NEW YORK, NY 10002 Community Board:   103
DOB Cross Street(s):   PIKE SLIP,    RUTGERS SLIP
Status:   C - JOB IS SIGNED OFF 01/22/2016
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  03/24/2014 5:54 PM
Application Entered:   03/24/2014 Job Start Date:   03/25/2014
Last Change:   01/22/2016 Job End Date:   12/25/2014
Appointment Status:   
Last Inspection By:   FATA, LUIGI       On     11/23/2015      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011422 Licensee Name: MICHAEL RIGLIETTI
Firm: 003360 Firm Name: MSR ELECTRICAL CONST CORP
Firm Phone: 718-743-2742  Firm Address: 2737 OCEAN AVENUE BROOKLYN NY 11229 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $42.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   K - Store
Store / Other:   FOOD
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: TOBY ROMANO
Owner Business Name: BREEZE NATIONAL
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND    10        10             
Buildings Total 10        10                
Total Units : 20 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  SIDE WALK SHED LIGHTING

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M351745
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 11/23/2015 12/01/2015 LUF C (15) (0) Y
INSPECTION COMMENTS: .HED REMOVED




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order