| NYC Department of Buildings | ||
| Electrical Application Details for App #: M350200 | ||
| Premises: 60 EAST 88 STREET MANHATTAN | BIN: 1046927 Block: 1499 Lot: 7501 |
| Printable (PDF) version of this Permit | |||||||||||
| DOB NOW: Inspections | |||||||||||
| Filed: | 62 E 88 ST | Census Tract: 150.02 | Health Area: 3600 | |
| 2ND FLOOR | Admin Area: M - MANHATTAN | Inspection Area: J | ||
| NEW YORK, NY 10128 | Community Board: 108 | |||
| DOB Cross Street(s): MADISON AVENUE, PARK AVENUE | |||
| Status: E - ABANDONED 08/22/2025 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 02/10/2014 9:21 PM | |
| Application Entered: 02/10/2014 | Job Start Date: 02/12/2014 | ||
| Last Change: 08/22/2025 | Job End Date: 03/05/2014 | ||
| COMPLETION FEE WAS BILLED | |||
| Appointment Status: | |||
| Last Inspection By: PANAYOTEDIS, STEPHEN On 04/30/2021 | |||
| Field Disp: H - NO PROGRESS ON JOB | |||
| Energize Recommendation: G - NO COMMENT | |||
| Objection Disposition: X - NOT REMOVED | |||
| License #: | 012593 | Licensee Name: | FARID J MARJI | |
| Firm: | 004424 | Firm Name: | NEW YORK EMPIRE ELECL CON | |
| Firm Phone: | 718-619-8181 | Firm Address: | 1236 JEROME AVENUE SERVICES INC BRONX NY 10452 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $245.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: O - Office Bldg | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | CALABRASE MIKE | ||||||
| Owner Business Name: | SIMONE DEVELOPMENT | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 2 | #10-Wire | 0 | |
| Existing Meters | 6 | + New Meters | 2 | - Removed Meters | 4 | = Total Meters | 4 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | V - OBJECTION(S) EXIST |
| Power Requested: | 02/10/2014 | Notice: | C - CALL TO OFFICE 05/03/2021 |
| Power Issued: | 02/10/2014 | Response: |
| Follow-Up: | |||
| Contractor's Comments: | |||
|
|