BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M344910
Premises: 328 7 AVENUE MANHATTAN BIN: 1014264     Block: 778   Lot: 43
   
Application Completed and Certified

Filed: 330 7 AV Census Tract:   95 Health Area:  5200
16 FL Admin Area:   M - MANHATTAN Inspection Area:   P
NEW YORK, NY 10001 Community Board:   105
DOB Cross Street(s):   WEST 28 STREET,    WEST 29 STREET
Status:   C - JOB IS SIGNED OFF 11/13/2013
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  09/09/2013 6:19 AM
Application Entered:   09/09/2013 Job Start Date:   09/09/2013
Last Change:   11/13/2013 Job End Date:   10/30/2013
Appointment Status:   
Last Inspection By:   AGELONIAS, ANASTASIOS       On     09/27/2013      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011252 Licensee Name: ALBERT V DATTOLO
Firm: 001211 Firm Name: RAINBOW ELECTRIC CO., INC
Firm Phone: 718-521-0926  Firm Address: 76-18 ROCKAWAY BLVD WOODHAVEN NY 11421 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $97.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   O - Office Bldg
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: DEWEY FATTORUSSO
Owner Business Name: MANHATTAN CONST GROUP
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  MAIN LUG
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
016  16    40                   
Buildings Total   40                      
Total Units : 40 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  PARTIAL NEW WIRING TO CUBICLES ON THE 16 FL

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M344910
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/27/2013 10/07/2013 IOS C (40) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back