| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
1 |
4- #6'S |
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
1 |
24 CIRCUIT |
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER PANELS MULTIWIRE CKT: NO GROUPED, NO SIMULTI. TRIP. 210.4 |
RSLV |
11/25/2013 |
05/11/2015 |
07/21/2015 |
| |
| 002 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED GND: 30A OVEN UNDER SIZE E.G.C. 250.122 |
RSLV |
11/25/2013 |
11/25/2013 |
05/11/2015 |
| |
| 003 |
( 36) |
CONDUCTORS ARE NOT PROPERLY COLOR CODED BSMT PANEL: COLOR CODE ON POWER. 210.5 |
RSLV |
11/25/2013 |
11/25/2013 |
05/11/2015 |
| |
| 004 |
( 21) |
CONDUCTORS HAVE NOT BEEN PROPERLY DE-RATED BSMT: PANEL: 10 CURREND CONDUCTOR IN RACEWAY. 310.15B2A |
RSLV |
11/25/2013 |
05/11/2015 |
07/21/2015 |
| |
| 005 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED BSMT: NO E. G. C. IN F M C. 250.112 |
RSLV |
11/25/2013 |
05/11/2015 |
07/21/2015 |
| |
| 006 |
( 29) |
OUTLET BOXES ARE NOT COVERED BSMT: NO OUTLET COVERS. 314.25 |
RSLV |
11/25/2013 |
05/11/2015 |
07/21/2015 |
| |
| 007 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY ROOF: NO PANEL DIRECTORY. 408.4 |
RSLV |
11/25/2013 |
11/25/2013 |
05/11/2015 |
| |
| 008 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED ROOF: GFCI NOT WEATHER-RESISTANT TYPE. 406.8A,B |
RSLV |
11/25/2013 |
11/25/2013 |
05/11/2015 |
| |
| 009 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED ROOF: A/C CONDENSER: NO E.G.C (60A 3 PHASE). 250.112 |
RSLV |
11/25/2013 |
11/25/2013 |
05/11/2015 |
| |
| 010 |
( 16) |
DEFECTIVE LIGHTING FIXTURES ARE IN USE GND BOILER RM: DEFECTIVE LIGHT FIXTURE. AM 110.2A |
RSLV |
11/25/2013 |
11/25/2013 |
05/11/2015 |