BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M340770
Premises: 54 EAST 3 STREET MANHATTAN BIN: 1006120     Block: 444   Lot: 16
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 54 E 3 ST Census Tract:   36.02
5,6,7,8,10,11,12,13,15,19,20, Admin Area:   M - MANHATTAN Inspection Area:   T
NEW YORK, NY 10003 Community Board:   103
DOB Cross Street(s):    2 AVENUE,    1 AVENUE
Status:   C - JOB IS SIGNED OFF 08/02/2018
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   05/23/2013 Job Start Date:   05/20/2013
Last Change:   08/02/2018 Job End Date:   05/20/2014
Appointment Status:   
Last Inspection By:   MCPARTLAND, BRIAN       On     08/01/2018      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 012538 Licensee Name: PAUL J MCTIERNAN
Firm: 004358 Firm Name: PHASEPOINT ELECTL CONTG I
Firm Phone: 718-418-0080  Firm Address: 538 WORTMAN AVENUE BROOKLYN NY 11208 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
L - LIGHTING WORK
Total Fee:  $732.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   Yes
Job Number:  121389871
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: GREGORY JONES
Authorized Representative:  PAUL MCTIERNAN
Relationship To Owner:   SUBCONTRACTOR


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  15  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  15  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
002  23  22             
002  25  24             
002  21  24             
002  26  23             
003  10  21  21             
003  11  22  23             
004  12  24  22             
004  13  21  23             
004  15  22  21             
005  18  23  24             
005  19  21  21             
005  20  26  25             
006  21  22  23             
006  22  21  22             
006  23  22  23             
Buildings Total 124  340  50  125  341                
Total Units : 980 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice: 1 - FIRST NOTICE 05/10/2018
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  21,22 & 23 GENERAL WIRING FOR LIGHTS,SWITCHES AND RECEPTACLE

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M340770
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/09/2018 05/10/2018 CBK V (130) (10)
INSPECTION COMMENTS: SEE OBJECTIONS DETAILS.
 
(2) 05/25/2018 05/29/2018 MJD J Y (120) (0)
INSPECTION COMMENTS: FAIL,
 
(3) 08/01/2018 08/01/2018 BMP C R (55) (0)
INSPECTION COMMENTS: OBJECTIONS RESOLVED. CERTIFIED.

OBJECTION FOR APPLICATION #: M340770
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (283) SMALL APPLIANCE OUTLETS NOT PROPERLY LOCATED
(FLOOR: 002) KITCHEN COUNTER TOP MISSING RECEPTACLE. APT.7
RSLV 05/09/2018 05/09/2018 08/01/2018
 
002 ( 53) GFCI HAS NOT BEEN PROVIDED
(FLOOR: 002) RECEPTACLE NOT GFCI WITHIN 6' OF SINK.
RSLV 05/09/2018 05/09/2018 05/25/2018
 
003 ( 58) FIXTURE NOT PROPERLY LOCATED IN CLOTHES CLOSET
(FLOOR: 002) OPEN BULB IN CLOSET. APT. 12.
RSLV 05/09/2018 05/09/2018 08/01/2018
 
004 ( 46) PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY
(FLOOR: 004) PANEL NOT PROPERLY LABELED. APT. 120
RSLV 05/09/2018 05/09/2018 08/01/2018
 
005 (340) RECEPTACLES NOT TAMPERPROOF
(ALL FLOORS) NOT ALL RECEPTACLES ARE TR. (BATH RM. AND KITCHEN)
RSLV 05/09/2018 05/09/2018 05/25/2018
 
006 ( 59) AFCI PROTECTION HAS NOT BEEN PROVIDED
(ALL FLOORS) NOT ALL REQUIRED CIRCUITS AFCI PROTECTED.
RSLV 05/09/2018 05/09/2018 08/01/2018
 
007 (999) OTHER
(ALL FLOORS)MICROWAVE BOXES SET BACK IN COMBUSTIBLE MATERIALS. 314.20
RSLV 05/09/2018 05/09/2018 05/25/2018
 
008 ( 24) ARMORED CABLES ARE NOT PROPERLY SECURED
(BASEMENT) CABLES NOT PROPERLY SUPPORTED.
RSLV 05/09/2018 05/09/2018 08/01/2018
 
009 ( 34) KNOCKOUTS ARE NOT CLOSED IN PANEL BOX
(BASEMENT) BREAKER BLANKS NEEDED IN PANELS.
RSLV 05/09/2018 05/09/2018 08/01/2018
 
010 ( 56) ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED
(BASEMENT) DOUBLE POLE BREAKERS NEEDED FOR FEEDERS.
RSLV 05/09/2018 05/09/2018 08/01/2018



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order