BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M339592
Premises: 42 WEST 13 STREET MANHATTAN BIN: 1009613     Block: 576   Lot: 16
   
Application Completed and Certified

Filed: 42 W 13 ST Census Tract:   63 Health Area:  5700
APT # 3CD Admin Area:   M - MANHATTAN Inspection Area:   S
NEW YORK, NY 10011 Community Board:   102
DOB Cross Street(s):    5 AVENUE,    AVENUE OF THE AMERICAS
Status:   C - JOB IS SIGNED OFF 10/27/2014
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  04/24/2013 3:47 PM
Application Entered:   04/24/2013 Job Start Date:   04/25/2013
Last Change:   10/27/2014 Job End Date:   04/17/2014
Appointment Status:   
Last Inspection By:   BERGMAN EDUARD       On     06/02/2014      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 012530 Licensee Name: HEMANCHAL DEONARINE
Firm: 004350 Firm Name: ELPO ELECTRICAL CONTG INC
Firm Phone: 718-384-6700  Firm Address: 50-03 METROPOLITAN AVE, SUITE B QUEENS NY 11385 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $144.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Commercial/Residential (1  Stores, 1 Apartments)
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: SANDRA LEONG
Owner Business Name: KERRY SULKOWICZ
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  2  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
003  CD  41  55    31               
Buildings Total 41  55    31                  
Total Units : 127 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice: 1 - FIRST NOTICE 06/07/2014
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M339592
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/14/2014 06/07/2014 TOR A (30) (2) Y
INSPECTION COMMENTS: V
 
(2) 06/02/2014 08/25/2014 EDB C R (60) (0) Y
INSPECTION COMMENTS: NONE

OBJECTION FOR APPLICATION #: M339592
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 ( 19) DEFECTIVE WIRING IS IN USE
HALL NO ACCESS TO SPLICE BOXES FOR PANELS
RSLV 05/14/2014 05/14/2014 06/02/2014
 
002 (999) OTHER
T-OUT BOXES SET BACK IN WOOD PANELS 314.20
RSLV 05/14/2014 05/14/2014 06/02/2014



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back