BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M334261
Premises: 565 BROOME STREET MANHATTAN BIN: 1089738     Block: 477   Lot: 35
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 100 VARICK ST Census Tract:   37 Health Area:  6800
STREET LEVEL Admin Area:   M - MANHATTAN Inspection Area:   U
NEW YORK, NY 10013 Community Board:   102
DOB Cross Street(s):   WATTS STREET,    BROOME STREET
Status:   C - JOB IS SIGNED OFF 09/28/2019
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  11/26/2012 3:35 PM
Application Entered:   11/26/2012 Job Start Date:   11/27/2012
Last Change:   09/28/2019 Job End Date:   07/07/2013
Appointment Status:   
Last Inspection By:   VAZQUEZ, LOUIS       On     06/17/2019      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011701 Licensee Name: ALBERTO SANCHEZ
Firm: 003779 Firm Name: GRX EURO ELECTRIC CORP
Firm Phone: 718-545-0035  Firm Address: 18-02 26TH ROAD ASTORIA NY 11102 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
Total Fee:  $415.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   H - Hotel
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: JOHN SORE
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  1  800 AMP DISCONNECT SWITCH
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  1  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  1  400 AMP PANEL
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 1
Existing Meters 0 + New Meters 1 - Removed Meters 0 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 11/26/2012 Notice:  
Power Issued: 11/26/2012 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALLING 3 PHASE 800 AMP SERVICE FOR TEMPORARY POWER.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M334261
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/17/2019 06/18/2019 LV1 C (25) (0) Y
INSPECTION COMMENTS: TEMP WORK REMOVED