BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M329087
Premises: 313 WEST 35 STREET MANHATTAN BIN: 1013574     Block: 759   Lot: 31
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 315 W 35 ST Census Tract:   111 Health Area:  5500
OUTSIDE/SIDEWALK Admin Area:   M - MANHATTAN Inspection Area:   Q
NEW YORK, NY 10001 Community Board:   104
DOB Cross Street(s):    8 AVENUE,    9 AVENUE
Status:   C - JOB IS SIGNED OFF 07/09/2019
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/29/2012 4:21 PM
Application Entered:   06/29/2012 Job Start Date:   06/29/2012
Last Change:   07/09/2019 Job End Date:   06/29/2013
Appointment Status:   
Last Inspection By:   MARCIN DUBAJ       On     07/09/2019      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011953 Licensee Name: IRVING BAPTISTE
Firm: 003611 Firm Name: RPJ ELECTRIC CORP
Firm Phone: 718-241-0277  Firm Address: 3421 CHURCH AVENUE BROOKLYN NY 11203 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $40.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:    INDUSTRIAL / MANUFA
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ROYCE DOUGLAS
Owner Business Name: BPC MANAGEMENT
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND                   
Buildings Total                   
Total Units : 7 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  SIDEWALK SHED 90 LF

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M329087
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/09/2019 07/09/2019 MJD C (20) (0) Y
INSPECTION COMMENTS: PASS, SHED IN USE WITH APP#M00023897




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order