| BUILDING OVERVIEW |
Are Feeders Being Installed? : |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 3) |
APPLICATION FOR CERTIFICATE OF ELECTRICAL INSPECTION NOT ON FILE WORK WITHOUT PERMIT TEMP LIGHTS,TEMP RECEPTACLE |
OPEN |
05/30/2012 |
05/30/2012 |
|
| |
| 002 |
(999) |
OTHER NEW PANEL ELEVATOR ROO,FEEDER,BASEMENT MOTOR ROOM AND STORAGE AREA |
OPEN |
05/30/2012 |
05/30/2012 |
|
| |
| 003 |
(999) |
OTHER TEMPORARY RECEPTACLE MUST BE G.F.I.PROTECTED.... - 590.6 |
OPEN |
05/30/2012 |
05/30/2012 |
|
| |
| 004 |
( 19) |
DEFECTIVE WIRING IS IN USE DEFECTIVE WIRING IN USE |
OPEN |
05/30/2012 |
05/30/2012 |
|
| |
| 005 |
( 16) |
DEFECTIVE LIGHTING FIXTURES ARE IN USE DEFECTIVE LIGHTING FIXTURES |
OPEN |
05/30/2012 |
05/30/2012 |
|
| |
| 006 |
(999) |
OTHER TEMP LIGHT NOT PROPERLY SUPPORTED...... - 4952.50RE: 3113399........*NOT A FINAL INSPECTION* |
OPEN |
05/30/2012 |
05/30/2012 |
|