Electrical Application Details for App #: M327894
Premises: 15 WEST 26 STREET MANHATTAN BIN: 1015643     Block: 828   Lot: 22
   
Application Completed and Certified

Filed: 17 W 26 ST Census Tract:   58 Health Area:  5700
GROUND FLOOR Admin Area:   M - MANHATTAN Inspection Area:   S
NEW YORK, NY 10010 Community Board:   105
DOB Cross Street(s):   BROADWAY,    AVENUE OF THE AMERICAS
Status:   C - JOB IS SIGNED OFF 07/24/2013
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/02/2012 12:08 AM
Application Entered:   06/02/2012 Job Start Date:   06/08/2012
Last Change:   07/24/2013 Job End Date:   06/05/2013
Appointment Status:   
Last Inspection By:   AGELONIAS, ANASTASIOS       On     04/15/2013      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010358 Licensee Name: JOSEPH L SPEZIALE
Firm: 003661 Firm Name: SPECTRUM ELECTRIC, LLC
Firm Phone: 718-986-2062  Firm Address: 49 ELIZABETH STREET STATEN ISLAND NY 10310 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $196.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   RESTAURANT
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: BRADLEY HORN
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  1  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND  GND  105  85    35  105         
Buildings Total 105  85    35  105              
Total Units : 335 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  TOTAL REWIRING TO EXISTING RISER

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M327894
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 04/15/2013 04/22/2013 IOS C (30) (0) Y
INSPECTION COMMENTS: NONE