| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
3 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
1 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 4) |
SERVICE IN EXCESS OF 1000KVA HAS NOT BEEN SUBMITTED FOR APPROVAL CELLAR: EL.RM.OVER 1000 KVA,CONTRACTOR ADD KRP-C - 800 SP IN S.SAM.110.2B,C. SERVICE A 4000A 277/480V |
RSLV |
09/30/2014 |
04/10/2015 |
07/09/2015 |
| |
| 002 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED CELLAR: EL.RM. 100A A/C DISC SM #6 AWG FUSED AT 80A. T.310.16 |
RSLV |
09/30/2014 |
07/09/2015 |
07/17/2015 |
| |
| 003 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED CELLAR: EL.RM.UNDERSIZE EQUIPMENT GND FOR 80A. T.250.122 |
RSLV |
09/30/2014 |
07/09/2015 |
07/17/2015 |
| |
| 004 |
( 21) |
CONDUCTORS HAVE NOT BEEN PROPERLY DE-RATED CELLAR: UNDERSIZE TAP CONDUCTOR FOR A/C - 1 FROM CH-2. 240.21 |
RSLV |
09/30/2014 |
01/06/2015 |
04/10/2015 |
| |
| 005 |
(999) |
OTHER EL RM: ALL EQUIPMENT NOT LABELLED IN CELLAR 230.2E |
RSLV |
01/06/2015 |
01/06/2015 |
04/10/2015 |