![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M321875 | ||
| Premises: 64 EAST 11 STREET MANHATTAN | BIN: 1009106 Block: 562 Lot: 16 |
| Filed: | 66 E 11 ST | Census Tract: 61 | Health Area: 5700 | |
| BASEMENT | Admin Area: M - MANHATTAN | Inspection Area: S | ||
| NEW YORK, NY 10003 | Community Board: 102 | |||
| Special Place Name: L.EAST SIDE | ||||
| Related Job Number: 120737408 | |||
| DOB Cross Street(s): UNIVERSITY PLACE, BROADWAY | |||
| Status: K - CLOSED/CANCELLED 05/02/2014 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 12/19/2011 3:25 PM | |
| Application Entered: 12/19/2011 | Job Start Date: 12/19/2011 | ||
| Last Change: 05/02/2014 | Job End Date: 04/21/2013 | ||
| Appointment Status: | |||
| Last Inspection By: BEST, J On 04/25/2014 | |||
| Field Disp: K - OK TO CANCEL | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 009279 | Licensee Name: | JOSEPH P TUZZOLO | |
| Firm: | 001985 | Firm Name: | TAFT ELECTRIC CO. INC. | |
| Firm Phone: | 718-858-1573 | Firm Address: | 65 SAINT FELIX STREET BROOKLYN NY 11217 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
9 - OTHER |
Total Fee: $40.00 | ||||||
| Other Work: STAND PIPE POWER | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: YES | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: 6 APT CONDOS | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | PAUL DAM | ||||||
| Owner Business Name: | VERINA | ||||||
| Authorized Representative: PAUL DAM | |||||||
| Relationship To Owner: MANAGER | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| BAS | 1 | 1 | 1 | |||||||||
| Buildings Total | 1 | 1 | ||||||||||
| Total Units : 2 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: POWER FOR PRESSURIZED DRY STANDPIPE | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 04/25/2014 | 05/02/2014 | JSB | K | (15) | (0) | Y | |||
| INSPECTION COMMENTS: | HAS BEEN REMOVED | |||||||||