Electrical Application Details for App #: M318732
Premises: 434 6 AVENUE MANHATTAN BIN: 1009454     Block: 573   Lot: 6
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 434 6 AV Census Tract:   63 Health Area:  5700
2ND FLOOR Admin Area:   M - MANHATTAN Inspection Area:   S
NEW YORK, NY 10011 Community Board:   102
DOB Cross Street(s):   CHRISTOPHER STREET,    WEST 10 STREET
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  09/15/2011 12:08 PM
Application Entered:   09/15/2011 Job Start Date:   09/15/2011
Last Change:   08/22/2025 Job End Date:   09/14/2012
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:   SCHIAVO, JAMES       On     06/11/2012      
Field Disp:   V - OBJCTN ISSD: JOB INCOMPLT
Energize Recommendation:  
Objection Disposition:  

License #: 011721 Licensee Name: CHRISTOPHER PACCIONE
Firm: 003156 Firm Name: CHRISTOPHER JON ELEC'L
Firm Phone: 718-389-9898  Firm Address: 513 13TH STREET STORE WEST CONTRACTORS, INC. NEW YORK NY 10009 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
9 - OTHER
Total Fee:  $405.00
Other Work:   RISERS
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Commercial/Residential (1  Stores, 9 Apartments)
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: CONSTRUCTION C/O GREENSTREET
Owner Business Name: C/O GREENSTREET CONSTRUCT
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  1  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  # 2 HVAC
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  2  3/0 FEEDERS
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  200 AMMP
D. 3 Phase Over 225 AMPS  1  225 AMP
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
001  2ND F  35  15    35  40         
Buildings Total 35  15    35     40           
Total Units : 130 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag: V - OBJECTION(S) EXIST
Power Requested: Notice: 1 - FIRST NOTICE 06/20/2012
Power Issued: Response:  

Follow-Up:
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M318732
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/11/2012 06/20/2012 JSV V (45) (1) Y
INSPECTION COMMENTS: POSSIBLE MORE THAN 6 SERVICE SWITCHES. COULD NOT GET FULL ACCESS

OBJECTION FOR APPLICATION #: M318732
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (999) OTHER
BASEMENT END LINE BOX COVER MISSING 314.28 (C)
OPEN 06/11/2012 06/11/2012