NYC Department of Buildings
Electrical Application Details for App #: M317503
Premises: 167 ORCHARD STREET MANHATTAN BIN: 1005524     Block: 416   Lot: 56
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 167 ORCHARD ST Census Tract:   30.01 Health Area:  6600
BASEMENT SERVICE, 2ND & 3RD Admin Area:   M - MANHATTAN Inspection Area:   T
NEW YORK, NY 10002 Community Board:   103
DOB Cross Street(s):   RIVINGTON STREET,    STANTON STREET
Status:   C - JOB IS SIGNED OFF 09/16/2019 Balance Paid By Owner
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  08/09/2011 2:45 PM
Application Entered:   08/09/2011 Job Start Date:   08/11/2011
Last Change:   09/16/2019 Job End Date:   09/05/2011
Appointment Status:   
Last Inspection By:   VINCENT CASTALDO       On     06/05/2019      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 011485 Licensee Name: BENJAMIN DREBIN
Firm: 002950 Firm Name: ACCURATE ELEC'L CORP.
Firm Phone: 718-606-9181  Firm Address: 11-07 43RD ROAD LONG ISLAND CITY NY 11101 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT
6 - GENERAL WIRING
7 - HVAC WIRING
Total Fee:  $831.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   CLUB
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: HEROLD SCHER
Owner Business Name: HSRE
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  1  
C. 201 Up to 600 AMPS  2  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  2  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  
D. 3 Phase Over 225 AMPS  2  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  1  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
002  2FL  30  22    15           
003  3RD  30  15      10         
Buildings Total 60  37    21       18           
Total Units : 136 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 1 #10-Wire 2
Existing Meters 2 + New Meters 3 - Removed Meters 2 = Total Meters 3

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 08/09/2011 Notice: 1 - FIRST NOTICE 03/22/2018
Power Issued: 08/09/2011 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M317503
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 12/15/2017 12/18/2017 CBK V (60) (11)
INSPECTION COMMENTS: SEE OBJECTION DETAILS.
 
(2) 03/22/2018 03/22/2018 PHG V Y (90) (15)
INSPECTION COMMENTS: CONTRACTOR TO FILE FOR ALL WORK INCLUDING PANELS AND FEEDERS DID NOT INSPECT ALL MOTORS DID NOT ENTER ROOF
 
(3) 01/09/2019 01/10/2019 ASK J Y (110) (2)
INSPECTION COMMENTS: FAIL. OBJECTION PARTIALLY REMOVED.
 
(4) 06/05/2019 06/05/2019 VTC C R (109) (0)
INSPECTION COMMENTS: PASS

OBJECTION FOR APPLICATION #: M317503
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (132) EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED
(ALL FLOORS) GROUND BAR NOT BONDED IN SOME PANELS.
RSLV 12/15/2017 12/15/2017 01/09/2019
 
002 ( 46) PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY
(ALL FLOORS) PANELS NOT PROPERLY LABELED
RSLV 12/15/2017 12/15/2017 01/09/2019
 
003 (999) OTHER
(ALL FLOORS) ARC FLASH STICKER NEEDED ON ALL EQUIPMENTS. 110.16
RSLV 12/15/2017 12/15/2017 03/22/2018
 
004 (999) OTHER
(ALL FLOORS) BREAKER TIES NEEDED ON SHARED NEUTRALS. 210.4
RSLV 12/15/2017 12/15/2017 03/22/2018
 
005 (124) TAP CONDUCTORS ARE NOT WITHIN 10 FT OR WITHIN 25 FT AS PER CODE
(BASEMENT) # 14 CORD TAP TO #4 IN KITCHEN FOR MIXER.
RSLV 12/15/2017 12/15/2017 06/05/2019
 
006 (126) BASEMENT WATER MAIN GROUND NOT INSTALLED ON WATER MAIN
(BASEMENT) NO WATER MAIN GROUND PROVIDED.
RSLV 12/15/2017 12/15/2017 03/22/2018
 
007 (133) NO GROUND ROD: BASEMENT OR OUTSIDE
(BASEMENT) NO SUPPLEMENTAL GROUND ON SERVICE.
RSLV 12/15/2017 12/15/2017 01/09/2019
 
008 ( 25) ARMORED CABLES ARE NOT PROPERLY TERMINATED
(BASEMENT) BX HANGING AT HOOD IN KITCHEN
RSLV 12/15/2017 12/15/2017 01/09/2019
 
009 (260) SIGNAGE NOT PROVIDED FOR SERVICE ROOM
(BASEMENT) NO SIGNAGE ON CLOSET DOOR.
RSLV 12/15/2017 12/15/2017 01/09/2019
 
010 (272) EQUIPMENT GROUNDING CONDUCTOR NOT PROPERLY INSTALLED
(BASEMENT) EQUIPMENT GROUND CONNECT TO NEUTRAL BAR
RSLV 12/15/2017 12/15/2017 01/09/2019
 
011 (999) OTHER
(BASEMENT) NOT SUFFICIENT LIGHTING IN SERVICE AREA.
RSLV 12/15/2017 12/15/2017 03/22/2018
 
012 (111) SUFFICIENT WORK SPACE IS NOT PROVIDED/MAINTAINED
(FLOOR: 002) NO WORKING SPACE FOR 2 FL PANEL
RSLV 03/22/2018 03/22/2018 01/09/2019
 
013 ( 56) ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED
(FLOOR: 002) SHEET ROCK SCREWS USED FORD DIMMER 2 FL 110.3
RSLV 03/22/2018 03/22/2018 01/09/2019
 
014 (999) OTHER
(ALL FLOORS) NO DISCONNECTS ON MOTORS OVER 1/8 HP 430
RSLV 03/22/2018 03/22/2018 01/09/2019
 
015 ( 1) SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER
(BASEMENT) ALL SERVICE ENTRANCE TROUGH AND PANEL NOT BONDED 250.92
RSLV 03/22/2018 03/22/2018 01/09/2019
 
016 (111) SUFFICIENT WORK SPACE IS NOT PROVIDED/MAINTAINED
(BASEMENT) NO 90 SWING ON ALL EL PANELS CLOSET 110.26
RSLV 03/22/2018 03/22/2018 01/09/2019
 
017 (136) GROUNDING ELECTRODE CONDUCTOR IS NOT CONTINUOUS
(BASEMENT) BOTH SIDES OF GEC 250.64
RSLV 03/22/2018 03/22/2018 01/09/2019
 
018 ( 22) FIXED EQUIPMENT IS NOT PROPERLY GROUNDED
(BASEMENT) NO BOND FOR MC CABLE T OUT 250.148
RSLV 03/22/2018 03/22/2018 06/05/2019
 
019 ( 22) FIXED EQUIPMENT IS NOT PROPERLY GROUNDED
(BASEMENT) GROUND AND NEURTAL NOT TOGETHER IN ALL SERVICE SW 250.24
RSLV 03/22/2018 03/22/2018 06/05/2019
 
020 (286) NO GFCI IN COMMERCIAL KITCHEN
(BASEMENT) NOT ALL 120V CKTS PROTECTED 210.8
RSLV 03/22/2018 03/22/2018 06/05/2019
 
021 ( 34) KNOCKOUTS ARE NOT CLOSED IN PANEL BOX
(BASEMENT) 600 AMP PANEL AND 6O AMP DISCONNECT
RSLV 03/22/2018 03/22/2018 01/09/2019
 
022 ( 56) ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED
(BASEMENT) BX SLEEVED THRU PIPE IN VAULT
RSLV 03/22/2018 03/22/2018 06/05/2019
 
023 ( 56) ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED
(BASEMENT) OPEN LUG ON COLLECTOR BAR UNDER SIZED 250.64 110.3
RSLV 03/22/2018 03/22/2018 01/09/2019
 
024 (999) OTHER
(BASEMENT) BX DOES NOT ENTER CONNECTOR LIGHT IN CLOSET 300.10
RSLV 03/22/2018 03/22/2018 01/09/2019
 
025 (999) OTHER
(BASEMENT) 60 AMP DISHWASHER DISCONNECT USED AS RACEWAY 312
RSLV 03/22/2018 03/22/2018 01/09/2019
 
026 (999) OTHER
(BASEMENT)TROUGH/BOX UNDER SIZED FOR BOTH SERVICE ENTRANCE 376.22 314.16
RSLV 03/22/2018 03/22/2018 01/09/2019
 
027 ( 29) OUTLET BOXES ARE NOT COVERED
(BASEMENT) MISSING COVERS 314.25
RSLV 01/09/2019 01/09/2019 06/05/2019
 
028 (999) OTHER
(BASEMENT) ARC FLASH LABEL NOT PROVIDED110 16 T-OUT
RSLV 01/09/2019 01/09/2019 06/05/2019