| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
2 |
|
| C. 201 Up to 600 AMPS |
3 |
|
| D. 601 Up to 1200 AMPS |
1 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
3 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
9 |
|
| D. 3 Phase Over 225 AMPS |
3 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
1 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER BASEMENT ALL SERVICE SWITCHES 250.56NEUTRAL BAR NOT BONDED TO ENCLOSURE |
RSLV |
06/04/2012 |
08/06/2012 |
09/06/2012 |
| |
| 002 |
(999) |
OTHER BASEMENT LIMITED FIRE PUMMP IS NOT 150% 695.4B |
RSLV |
06/04/2012 |
08/06/2012 |
09/06/2012 |
| |
| 003 |
(999) |
OTHER BASEMENT SERVICE ENTRANCE CONDUCTOR 250.66NOT PROPERLY GROUNDED |
RSLV |
06/04/2012 |
08/06/2012 |
09/06/2012 |
| |
| 004 |
(999) |
OTHER BASEMENT SERVICE SWITCHE FOR 3=FT TO 8TH FLOOR 240OVER FUSES. 350 MCM. FUSE AT 600 |
RSLV |
06/04/2012 |
08/06/2012 |
09/06/2012 |
| |
| 005 |
(999) |
OTHER BASEMENT SERVICE ENTRANCE CONDUCTOR FOR 1 FLOOR. 2 FLOOR UNDER SIZE250.66 |
RSLV |
06/04/2012 |
08/06/2012 |
09/06/2012 |
| |
| 006 |
(999) |
OTHER BASEMENT BOILER ROOM. NO GFCI PROVIDED 620.22B |
RSLV |
06/04/2012 |
08/06/2012 |
09/06/2012 |
| |
| 007 |
(999) |
OTHER ALL FLOOR VERTICAL RACEWAY 300.19NO SUPPORT FOR VERTICAL RACEWAY |
RSLV |
06/04/2012 |
06/04/2012 |
08/06/2012 |
| |
| 008 |
(999) |
OTHER LIMITED FIRE PUMP RACEWAY 695COMPLIANCE NOT STEEL AND CONNECTORS |
RSLV |
06/04/2012 |
08/06/2012 |
09/06/2012 |
| |
| 009 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY ALL FLOORS SUB PANELSNO DIRECTORY PROVIDED |
RSLV |
06/04/2012 |
06/04/2012 |
08/06/2012 |
| |
| 010 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED ROOF TOP A/C UNITSNOT GROUNDED. INSPECTION NOT FINAL |
RSLV |
06/04/2012 |
08/06/2012 |
09/06/2012 |