|
||
NYC Department of Buildings | ||
Electrical Application Details for App #: M313590 |
Premises: 626 5 AVENUE MANHATTAN | BIN: 1083860 Block: 1266 Lot: 1 |
Printable (PDF) version of this Permit |
Filed: | 45 ROCKEFELLER PLAZA | Census Tract: 104 | Health Area: 4800 | |
23RD FLOOR | Admin Area: M - MANHATTAN | Inspection Area: L | ||
NEW YORK, NY 10020 | Community Board: 105 | |||
Special Place Name: TISHMAN SPEYER |
DOB Cross Street(s): WEST 50 STREET, WEST 51 STREET | |||
Status: I - AWAITING INSPECTION REQUEST | |||
Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 04/15/2011 7:46 AM | |
Application Entered: 04/15/2011 | Job Start Date: 04/18/2011 | ||
Last Change: 03/12/2014 | Job End Date: 05/30/2011 |
Appointment Status: | |||
Last Inspection By: On | |||
Field Disp: | |||
Energize Recommendation: | |||
Objection Disposition: |
License #: | 011743 | Licensee Name: | JOSE A LLIGUICHUSHCA | |
Firm: | 001965 | Firm Name: | NEAD ELECTRIC INC. | |
Firm Phone: | 212-764-2752 | Firm Address: | 530 WEST 50TH STREET NEW YORK NY 10019 |
Other Licensees and Firms: | ||||
License # | Licensee Name | Firm # | Firm Name | Type |
011480 | CARDILLO, GREGORY J | 001965 | NEAD ELECTRIC INC. | RESPONSIBLE REP |
Work Started or Filed by Others: NO | ||||||||
Work Category: R - REHABILITATION | Work To Be Done:
T - TEMPORARY LIGHT & POWER |
Total Fee: $53.50 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: No |
Building Used As: O - Office Bldg | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: NOT APPLICABLE | |||||||
Owner / Occup: | |||||||
Owner Business Name: | RCPI LANDMARK PROPERTIES | ||||||
Authorized Representative: | |||||||
Relationship To Owner: |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
023 | 31 | 2 | 31 | |||||||||
Buildings Total | 31 | 2 | 31 | |||||||||
Total Units : 64 units |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
Power Auth Flag: | Objection Flag: | ||
Power Requested: | Notice: | ||
Power Issued: | Response: |
Follow-Up: | |||
Contractor's Comments: J-TISHMAN1 - JS FURNISH AND INSTALL TEMPORARY LIGHTING ON THE 23RD FLOOR (WHITE BOX TEMP INSTALLATION). EXISTING SERVICE. |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
(1) | 09/06/2011 | 09/13/2011 | RID | Z | (0) | (0) | Y | |||
INSPECTION COMMENTS: | NONE |