| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
3 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
110 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
5 |
5 SETS |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
110 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
6 |
|
| D. 3 Phase Over 225 AMPS |
4 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
4 |
(INSIDE ELEVATORS) |
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 53) |
GFCI HAS NOT BEEN PROVIDED THROUGH-OUT: KITCHEN COUNTERS |
RSLV |
05/10/2012 |
05/10/2012 |
08/07/2012 |
| |
| 002 |
(999) |
OTHER ALL APT.PNLS: NEUTRAL BONDED TO ENCLOSURE...... - 250.24A5 |
RSLV |
05/10/2012 |
05/10/2012 |
08/07/2012 |
| |
| 003 |
(999) |
OTHER THROUGH-OUT ALL APT: RECEPTACLES NOT PROPERLY BONDED.... - 250.146 |
RSLV |
05/10/2012 |
05/10/2012 |
08/07/2012 |
| |
| 004 |
(999) |
OTHER ALL SUB GEAR FEEDERS EQUIPT GRD UNDERSIZED 250.122 |
RSLV |
08/07/2012 |
08/07/2012 |
09/11/2012 |
| |
| 005 |
(999) |
OTHER SD RM DOOR NOT EQUIPED WITH PANIC BARS 110.26(C)(2) |
RSLV |
08/07/2012 |
08/07/2012 |
09/11/2012 |
| |
| 006 |
(999) |
OTHER FP FEEDER FROM CNTROLLER TO MOTOR NOT RMC 695.6(D) |
RSLV |
08/07/2012 |
08/07/2012 |
09/11/2012 |
| |
| 007 |
(999) |
OTHER GEN FEEDER RACEWAY EMT USED OUTDOOR 358.12(7) NYC AMENDMENT |
RSLV |
08/07/2012 |
08/07/2012 |
09/11/2012 |