Electrical Application Details for App #: M311181
Premises: 372 5 AVENUE MANHATTAN BIN: 1015898     Block: 837   Lot: 40
   
Application Completed and Certified

Filed: 372 5 AV Census Tract:   8400 Health Area:  5200
APT 5E Admin Area:   M - MANHATTAN Inspection Area:   P
NEW YORK, NY 10001 Community Board:   105
DOB Cross Street(s):    5 AVENUE,    AVENUE OF THE AMERICAS
Status:   C - JOB IS SIGNED OFF 08/30/2011
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  02/08/2011 12:55 PM
Application Entered:   02/08/2011 Job Start Date:   02/09/2011
Last Change:   08/30/2011 Job End Date:   03/31/2011
Appointment Status:   
Last Inspection By:   DALTON HENLON       On     06/13/2011      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011406 Licensee Name: FRANK DISTEFANO
Firm: 002850 Firm Name: ENERGIZE ELC'L CNTRG CORP
Firm Phone: 718-366-3730  Firm Address: 60-35 FRESH POND ROAD MASPETH NY 11378 

Work Started or Filed by Others: YES
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $44.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: NICK OZKAN
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
005  5E  15                 
Buildings Total 15                    
Total Units : 27 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  WIRING FOR POWER AND LIGHT STARTED BY OTHER.INSTALL OUTLETS,SWITCH AND LIGHT FIXTURES TO EXISTING WIRING

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M311181
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/13/2011 06/24/2011 DAH C (20) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.