| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
2 |
2-30A FC |
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
400A |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
2 |
SETS 3/0 |
| D. Over 250 MCM |
1 |
4 #500 MCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
2 |
2-200A |
| D. 3 Phase Over 225 AMPS |
1 |
1-400 DP |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED 1ST FLOOR - HANGING FIXTURES NO GROUNDING |
RSLV |
08/29/2011 |
08/29/2011 |
12/09/2011 |
| |
| 002 |
( 53) |
GFCI HAS NOT BEEN PROVIDED BASEMENT - OUTLET NOT GFCI PROTECTED |
RSLV |
08/29/2011 |
08/29/2011 |
12/09/2011 |
| |
| 003 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER BASEMENT FUSE CUT OUTBOX RACEWAY NOT BONDED |
RSLV |
08/29/2011 |
08/29/2011 |
12/09/2011 |
| |
| 004 |
(999) |
OTHER BSMT: SERVICE SWS NOT GROUPED |
RSLV |
12/09/2011 |
12/09/2011 |
02/09/2012 |
| |
| 005 |
(999) |
OTHER BSMT: ALL AREA WITH MC CABLE OUTLET BOXES ARE NOT BONDED BSMT 1STFLOOR |
RSLV |
12/09/2011 |
12/09/2011 |
02/09/2012 |
| |
| 006 |
( 30) |
OUTLET BOXES ARE NOT SECURED ROOF: A/C UNIT |
RSLV |
12/09/2011 |
12/09/2011 |
02/09/2012 |
| |
| 007 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY BSMT: GROUND RACEWAY AT WATER MAIN |
RSLV |
12/09/2011 |
12/09/2011 |
02/09/2012 |
| |
| 008 |
( 4) |
SERVICE IN EXCESS OF 1000KVA HAS NOT BEEN SUBMITTED FOR APPROVAL BSMT: SER SWITCHES NOT GROUP |
RSLV |
02/09/2012 |
02/09/2012 |
07/19/2012 |
| |
| 009 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY BSMT: WATER METER NOT JUMP |
RSLV |
02/09/2012 |
02/09/2012 |
07/19/2012 |
| |
| 010 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER BSMT: FUSE CUT OUT BOX RACEWAY NOT BONDED |
RSLV |
02/09/2012 |
02/09/2012 |
07/19/2012 |