Premises: 1180 PARK AVENUE MANHATTAN BIN: 1047124     Block: 1505   Lot: 33
   

Filed: 75 E 93 ST Census Tract:   160.01 Health Area:  2820
PARK AVENUE SIDE OF BUILDING Admin Area:   M - MANHATTAN Inspection Area:   J
NEW YORK, NY 10128 Community Board:   108
DOB Cross Street(s):   MADISON AVENUE,    PARK AVENUE
Status:   K - CLOSED/CANCELLED 07/20/2011
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  01/07/2011 12:41 PM
Application Entered:   01/07/2011 Job Start Date:   01/07/2011
Last Change:   07/20/2011 Job End Date:   05/30/2011
Appointment Status:   
Last Inspection By:   DALTON HENLON       On     07/12/2011      
Field Disp:   K - OK TO CANCEL
Energize Recommendation:  
Objection Disposition:  

License #: 011581 Licensee Name: VINCENT LOGOZZO
Firm: 003334 Firm Name: ABILENE ELECTRIC INC
Firm Phone: 718-372-4210  Firm Address: 2402 NEPTUNE AVENUE BROOKLYN NY 11224 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
8 - BOILER/BURNER WIRING
T - TEMPORARY LIGHT & POWER
Total Fee:  $52.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   HOUSE OF WORSHIP
Special Cert Approval:   B - BOILER CONTROLS J-51 CERTIFICATION
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: SYNOD OF BISHOPS
Authorized Representative:  GEORGE SCHATILOFF
Relationship To Owner:   FACILITY MANAGER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  LOW PRESSURE STEAM

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  TEMPORARY EMERGENCY MOBILE HEATING UNIT ON PARK AVE.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M310281
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/12/2011 07/20/2011 DAH K (10) (0) Y
INSPECTION COMMENTS: INSTALLED AND REMOVED