BIS Menu  |  Pre-BIS PA CO Query By Bin  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M308385
Premises: 192 BLEECKER STREET MANHATTAN BIN: 1008301     Block: 526   Lot: 23
   
Application Completed and Certified

Filed: 192 BLEECKER ST Census Tract:   6500 Health Area:  5700
1 FLOOR Admin Area:   M - MANHATTAN Inspection Area:   S
NEW YORK, NY 10012 Community Board:   102
Special Place Name:   SUBWAY
DOB Cross Street(s):   MAC DOUGAL STREET,    AVENUE OF THE AMERICAS
Status:   C - JOB IS SIGNED OFF 05/11/2011
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  11/02/2010 10:29 AM
Application Entered:   11/02/2010 Job Start Date:   11/02/2010
Last Change:   05/11/2011 Job End Date:   02/28/2011
Appointment Status:   
Last Inspection By:   RIVERA, F       On     05/02/2011      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010804 Licensee Name: SANG CHEUNG
Firm: 002065 Firm Name: AL-LECTRIC ELECT'L CONTRG
Firm Phone: 212-219-3336  Firm Address: 137 CHRYSTIE STREET NEW YORK NY 10002 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $52.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   K - Store
Store / Other:   SUBWAY
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: MICHAEL KUO
Owner Business Name: MICHELLE KUO CORPORATION
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
001    16  20    16             
Buildings Total 16  20    16                
Total Units : 60 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  NO OUTDOOR SIGN AND OUTDOOR LIGHT

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M308385
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/02/2011 05/09/2011 FRI C (15) (0) Y
INSPECTION COMMENTS: N/A




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Pre-BIS PA CO Query By Bin  |  Electrical Inspection Work Order  |  Back