![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M306823 | ||
| Premises: 605 EAST 9 STREET MANHATTAN | BIN: 1079685 Block: 392 Lot: 10 |
| Printable (PDF) version of this Permit | |||||||||||
| DOB NOW: Inspections | |||||||||||
| Filed: | 350 E 10TH ST | Census Tract: 2800 | Health Area: 6300 | |
| GROUND | Admin Area: M - MANHATTAN | Inspection Area: T | ||
| NEW YORK, NY 10009 | Community Board: 103 | |||
| DOB Cross Street(s): AVENUE B, AVENUE C | |||
| Status: E - ABANDONED 08/22/2025 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 09/15/2010 2:59 PM | |
| Application Entered: 09/15/2010 | Job Start Date: 09/15/2010 | ||
| Last Change: 08/22/2025 | Job End Date: 09/15/2011 | ||
| Appointment Status: | |||
| Last Inspection By: PIERRE FAYOLA On 11/23/2024 | |||
| Field Disp: J - JOB IN PROGRESS | |||
| Energize Recommendation: | |||
| Objection Disposition: X - NOT REMOVED | |||
| License #: | 009441 | Licensee Name: | ANTHONY G FERRY | |
| Firm: | 000138 | Firm Name: | ANTHONY G FERRY INC | |
| Firm Phone: | 646-678-3795 | Firm Address: | 314 CITY ISLAND AVENUE BRONX NY 10464 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
W - SIDEWALK SHED WIRING & LIGHTING |
Total Fee: $40.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | JEREMIAH HARRINGTON | ||||||
| Owner Business Name: | ROCKLEDGE SCAFFOLD | ||||||
| Authorized Representative: JEREMIAH HARRINGTON | |||||||
| Relationship To Owner: OWNER | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| SWK | 3 | 4 | ||||||||||
| Buildings Total | 3 | 4 | ||||||||||
| Total Units : 7 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | V - OBJECTION(S) EXIST | |
| Power Requested: | Notice: | C - CALL TO OFFICE 11/23/2024 | |
| Power Issued: | Response: |
| Follow-Up: | |||
| Contractor's Comments: TEMP BRIDGE LIGHTING | |||
|
|