| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
3PHASE 600A |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
2 |
|
| B. Over #2 to 1/0 |
5 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
1 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
6 |
1PHASE 220V 12/24/ EACH |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
2 |
3PHASE 220V 30CIR/ EACH |
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER (ALL FLOORS) EL.ROOM: TROUGH ABOVE METER |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 002 |
( 7) |
EMT IS NOT PROPERLY SUPPORTED (TYPE:EMT) (ALL FLOORS) EL ROOM |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 003 |
(999) |
OTHER (ALL FLOORS) EL ROOM: BOTH TROUGH NOT SECURED 4'X 6' X 6".. 376.30 |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 004 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED (ALL FLOORS)EL.ROOM: TROUGH BOTH 6" X 6" X 4'(MAX CABLE SIZE 500 MCM) |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 005 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (ALL FLOORS) BASE: WATER GR.CLAMP & LUG ARE LOOSE |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 006 |
(999) |
OTHER (ALL FLOORS) BASE: WATER GR CLAMP DOUBLE LUGGED.. 110.14 |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 007 |
(279) |
WATER METER JUMPER IS MISSING/IMPROPER (ALL FLOORS) BASE: UNDERSIZED |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 008 |
(999) |
OTHER (ALL FLOORS) OUTSIDE: SUPPLEMENTAL GROUND ROD NEXT TO WALL.. 250.56 |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 009 |
(999) |
OTHER (ALL FLOORS)EL.ROOM: TAP ON TAP IN METER TERMINAL BOX 600 TO 3/0 TO #3 AWG260.21 |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 010 |
(999) |
OTHER (ALL FLOORS)EL ROOM:2' X 4" X 4" & 4' X 6" X " TROUGHS NOT SIZED AS PER 376.23 |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 011 |
( 21) |
CONDUCTORS HAVE NOT BEEN PROPERLY DE-RATED (ALL FLOORS) BASE: PLP WEST & PLP EAST |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 012 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY (ALL FLOORS) BASE: PLP WEST & PLP - EAST |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 013 |
(999) |
OTHER (ALL FLOORS) BASE: G.F.C.I.UNDER PLP W NOT MOUNTED AS PER 406.4(C) |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 014 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY (ALL FLOORS) BASE: B2-W,B1-W |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 015 |
(999) |
OTHER (ALL FLOORS)BASE: B2-W BEDR.RECE AT BOTTOM BUILT IN SHELVS NEXT TO DESK & M.WSET TOO DDEP.. 314.20 |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 016 |
( 18) |
DEFECTIVE RECEPTACLES ARE IN USE (ALL FLOORS) B1-W: COUNTER G.F.C.I.ON THE RIGHT OF STOVE |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 017 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (ALL FLOORS) B1-W: #14 AWG E.B.J.USED IN OUTLET BOXES |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 018 |
( 27) |
ARMORED CABLES INSTALLED WITHOUT INSULATING BUSHINGS (ALL FLOORS) B1-W: BATHROOM |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 019 |
( 21) |
CONDUCTORS HAVE NOT BEEN PROPERLY DE-RATED (ALL FLOORS) BASE: PLP E |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 020 |
( 19) |
DEFECTIVE WIRING IS IN USE (ALL FLOORS) BASE: PLP E #14 AWG WIRE USED.. 210.24 AM |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 021 |
(999) |
OTHER (ALL FLOORS) BASE: BREAKER DOUBLE LUGGED IN PLP-E.. 110.14 |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 022 |
( 34) |
KNOCKOUTS ARE NOT CLOSED IN PANEL BOX (ALL FLOORS) BASE: APT.GAE |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 023 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (ALL FLOORS) BASE: GAE A/C COMP E.B.J.NOT PER 250.122 |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |
| |
| 024 |
(999) |
OTHER (ALL FLOORS) BASE: GAE A/C LFMC OVER 6'.. 350.12(3)AM |
RSLV |
05/22/2015 |
05/22/2015 |
08/03/2016 |