BIS Menu  |  Pre-BIS PA CO Query By Bin  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M305606
Premises: 25 WAVERLY PLACE MANHATTAN BIN: 1008835     Block: 548   Lot: 21
   
Application Completed and Certified

Filed: 25 WAVERLY PL Census Tract:   5900 Health Area:  5700
BASEMENT MOTOR ROOM Admin Area:   M - MANHATTAN Inspection Area:   S
NEW YORK, NY 10003 Community Board:   102
DOB Cross Street(s):   GREENE STREET,    UNIVERSITY PLACE
Status:   C - JOB IS SIGNED OFF 01/04/2011
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  08/11/2010 10:14 AM
Application Entered:   08/11/2010 Job Start Date:   08/13/2010
Last Change:   01/04/2011 Job End Date:   09/13/2010
Appointment Status:   
Last Inspection By:   DALTON HENLON       On     10/12/2010      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 009849 Licensee Name: CHAIM WRUBEL
Firm: 000678 Firm Name: HY-LEE ELECTRIC CO., INC.
Firm Phone: 718-886-1913  Firm Address: 14-34 110TH STREET SUITE 102 COLLEGE POINT NY 11356 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $63.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   O - Office Bldg
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: NYU
Authorized Representative:  JAMIE WEKERLE
Relationship To Owner:   ELEVATOR CONTRACTOR


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  1  100-AMPERE
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  6-CIRCUIT PANELETTE
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS                   
Buildings Total                   
Total Units : 4 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  REMOVE AND REPLACE MAIN LIGHT SWITCH AND CIRCUIT BREAKER BOX IN MOTOR ROOM.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M305606
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/12/2010 10/20/2010 DAH C (45) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Pre-BIS PA CO Query By Bin  |  Electrical Inspection Work Order  |  Back