Electrical Application Details for App #: M304971
Premises: 124 LUDLOW STREET MANHATTAN BIN: 1005328     Block: 410   Lot: 44
   
Application Completed and Certified

Filed: 124 LUDLOW ST Census Tract:   18 Health Area:  7400
SIDEWALK Admin Area:   M - MANHATTAN Inspection Area:   V
NEW YORK, NY 10002 Community Board:   103
DOB Cross Street(s):   DELANCEY STREET,    RIVINGTON STREET
Status:   C - JOB IS SIGNED OFF 12/11/2014
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/23/2010 12:31 PM
Application Entered:   07/23/2010 Job Start Date:   07/23/2010
Last Change:   12/11/2014 Job End Date:   01/23/2011
Appointment Status:   
Last Inspection By:   KELLER, JONATHAN       On     10/07/2014      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 009611 Licensee Name: WINSTON BERKEL
Firm: 003336 Firm Name: U.S. ELECTRIC CORP.
Firm Phone: 718-706-1442  Firm Address: 13-07 37TH AVENUE LONG ISLAND CITY NY 11101 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $40.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   RESIDENTIAL/COMMERCI
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: PRABHJIT SINGH
Owner Business Name: ROCK SCAFFOLDING CORP
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
SWK                     
Buildings Total                     
Total Units : 8 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALL SIDEWALK SHED LIGHTING

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M304971
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/07/2014 10/08/2014 JKE C (5) (0) Y
INSPECTION COMMENTS: NO SHED