Electrical Application Details for App #: M303555
Premises: 561 WEST 23 STREET MANHATTAN BIN: 1012341     Block: 695   Lot: 1
   

Filed: 184 11 AV Census Tract:   99 Health Area:  5500
STREET Admin Area:   M - MANHATTAN Inspection Area:   Q
NEW YORK, NY 10011 Community Board:   104
DOB Cross Street(s):   WEST 23 STREET,    WEST 24 STREET
Status:   V - OBJECTION PENDING AT OWNER 06/10/2010
Request Type:   P - PICK-UP eFiled:   NO
Application Entered:   06/10/2010 Job Start Date:  
Last Change:   06/10/2010 Job End Date:  
Appointment Status:   
Last Inspection By:   HINDS EUGENE       On     06/02/2010      
Field Disp:   W - ISSUE OBJECTION TO OWNER
Energize Recommendation:  
Objection Disposition:  

License #: Licensee Name: UNKNOWN
Firm: Firm Name: UNKNOWN
Firm Phone:   Firm Address:  

Work Started or Filed by Others: NO
Work Category:    Work To Be Done:   Total Fee:  $0.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: NICK AND DUKE
Owner Business Name: GURDAYAL KOHLY
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag: V - OBJECTION(S) EXIST
Power Requested: Notice: 1 - FIRST NOTICE 06/10/2010
Power Issued: Response:  

Follow-Up: V - OWNER OBJECTION 06/10/2010
Contractor's Comments:  FRONT OF BUILDING

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M303555
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/02/2010 06/10/2010 EHD W (30) (4)
INSPECTION COMMENTS: SEE VIOLATION DETAILS

OBJECTION FOR APPLICATION #: M303555
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 ( 3) APPLICATION FOR CERTIFICATE OF ELECTRICAL INSPECTION NOT ON FILE
SIGN
OPEN 06/02/2010 06/02/2010
 
002 ( 2) ELECTRIC SIGN HAS BEEN INSTALLED PRIOR TO INSPECTION
NO SIGN TAG POSTED
OPEN 06/02/2010 06/02/2010
 
003 ( 25) ARMORED CABLES ARE NOT PROPERLY TERMINATED
HANGING FROM FIRE ESCAPE
OPEN 06/02/2010 06/02/2010
 
004 ( 28) ELECTRICAL MATERIAL USED FOR LUMINAIRES HAS NOT BEEN APPROVED
BOX NOT WEATHER PROOF*THIS IS NOT FINAL*
OPEN 06/02/2010 06/02/2010



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order