![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M302133 | ||
| Premises: 40 EAST 83 STREET MANHATTAN | BIN: 1046768 Block: 1494 Lot: 50 |
| Application Completed and Certified | ||
| Filed: | 40 E 83 ST | Census Tract: 142 | Health Area: 3600 | |
| APT 8W | Admin Area: M - MANHATTAN | Inspection Area: J | ||
| NEW YORK, NY 10028 | Community Board: 108 | |||
| DOB Cross Street(s): MADISON AVENUE, PARK AVENUE | |||
| Status: C - JOB IS SIGNED OFF 12/14/2010 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 04/26/2010 1:11 PM | |
| Application Entered: 04/26/2010 | Job Start Date: 04/27/2010 | ||
| Last Change: 12/14/2010 | Job End Date: 04/01/2011 | ||
| Appointment Status: | |||
| Last Inspection By: HINDS EUGENE On 12/06/2010 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: | |||
| License #: | 011717 | Licensee Name: | CONSTANTINE MEGARIS | |
| Firm: | 003604 | Firm Name: | MEGARIS ELEC'L CONTG CORP | |
| Firm Phone: | 718-886-2240 | Firm Address: | 10-01 37TH AVENUE LONG ISLAND CITY NY 11101 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $107.50 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | MR & MRS FIELDS | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 008 | 8W | 15 | 5 | |||||||||
| Buildings Total | 15 | 5 | ||||||||||
| Total Units : 20 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 1 | #10-Wire | 0 | |
| Existing Meters | 1 | + New Meters | 1 | - Removed Meters | 1 | = Total Meters | 1 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 04/26/2010 | Notice: | |
| Power Issued: | 04/26/2010 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: SX - NEW 3 PHASE METER & PANEL | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 12/06/2010 | 12/10/2010 | EHD | C | E | (60) | (0) | Y | ||
| INSPECTION COMMENTS: | NONE | |||||||||