| NYC Department of Buildings | ||
| Electrical Application Details for App #: M301498 | ||
| Premises: 63 5 AVENUE MANHATTAN | BIN: 1009391 Block: 571 Lot: 1 |
| Application Completed and Certified | ||
| Filed: | 65 5 AV | Census Tract: 61 | Health Area: 5700 | |
| SIDEWALK | Admin Area: M - MANHATTAN | Inspection Area: S | ||
| NEW YORK, NY 10003 | Community Board: 102 | |||
| Special Place Name: NEW SCHOOL | ||||
| DOB Cross Street(s): EAST 13 STREET, EAST 14 STREET | |||
| Status: C - JOB IS SIGNED OFF 05/22/2012 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 04/07/2010 9:04 AM | |
| Application Entered: 04/07/2010 | Job Start Date: 04/07/2010 | ||
| Last Change: 05/22/2012 | Job End Date: 04/30/2010 | ||
| Appointment Status: | |||
| Last Inspection By: MCKENZIE, W. On 05/08/2012 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 010538 | Licensee Name: | HUGH O'KANE, JR. | |
| Firm: | 000674 | Firm Name: | HUGH O'KANE ELEC. CO. INC | |
| Firm Phone: | 212-431-6007 | Firm Address: | 30-40 48TH AVENUE LONG ISLAND CITY NY 11101 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 2 - TEMPORARY CONSTRUCTION |
Total Fee: $865.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: W - School | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | LIA GARNTNER | ||||||
| Owner Business Name: | THE NEW SCHOOL | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 1 | |
| Existing Meters | 1 | + New Meters | 1 | - Removed Meters | 1 | = Total Meters | 1 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 04/07/2010 | Notice: | 1 - FIRST NOTICE 12/13/2010 |
| Power Issued: | 04/07/2010 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: TEMP SWITCHBOARD FOR CONSTRUCTION | |||
|
|