![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M298476 | ||
| Premises: 43 BOND STREET MANHATTAN | BIN: 1083176 Block: 529 Lot: 30 |
| Application Completed and Certified | ||
| Filed: | 43 BOND ST | Census Tract: 55.02 | Health Area: 5700 | |
| STREET | Admin Area: M - MANHATTAN | Inspection Area: S | ||
| NEW YORK, NY 10012 | Community Board: 102 | |||
| Special Place Name: TEMP HOIST CAR | ||||
| DOB Cross Street(s): LAFAYETTE STREET, BOWERY | |||
| Status: C - JOB IS SIGNED OFF 03/01/2013 | Balance Paid By Owner | ||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 12/14/2009 8:08 AM | |
| Application Entered: 12/14/2009 | Job Start Date: 12/14/2009 | ||
| Last Change: 03/01/2013 | Job End Date: 12/14/2010 | ||
| Appointment Status: | |||
| Last Inspection By: RIVERA, F On 01/17/2013 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011990 | Licensee Name: | DECLAN W DELAHUNTY | |
| Firm: | 003662 | Firm Name: | SHUIR ELEC'L CONTR'S CORP | |
| Firm Phone: | 718-414-4840 | Firm Address: | 4360 BULLARD AVENUE BRONX NY 10466 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT |
Total Fee: $48.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: TEMP. HOIST CAR | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | JEREMIAH HARRINGTON | ||||||
| Owner Business Name: | ROCKLEDGE SCAFFOLD CORP | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| SWK | 1 | 1 | ||||||||||
| Buildings Total | 1 | 1 | ||||||||||
| Total Units : 2 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: CONNECTED POWER FOR PERSONNEL MATERIAL HOIST CAR TO SECONDARY SIDE OF 208V/480V TRANSFORMER PROVIDED BY BUILDING. INSTALLED ONE 100AMP, 3PH, 480V DISCONNECT FOR THIS HOIST CAR. | |||
|
|