BUILDING OVERVIEW |
Are Feeders Being Installed? : |
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
Building Overview Work Items |
QUANTITY |
DESCRIPTION |
SERVICE SWITCHES |
|
A. Up to 100 AMPS |
0 |
|
B. 101 Up to 200 AMPS |
0 |
|
C. 201 Up to 600 AMPS |
0 |
|
D. 601 Up to 1200 AMPS |
0 |
|
E. Over 1200 AMPS |
0 |
|
SER. ENT. & FDR COND (EACH SET) |
|
A. Up to #2 CONDUCTOR |
0 |
|
B. Over #2 to 1/0 |
0 |
|
C. Over 1/0 to 250 MCM |
0 |
|
D. Over 250 MCM |
0 |
|
PANELS |
|
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
C. 3 Phase Up to 225 AMPS |
0 |
|
D. 3 Phase Over 225 AMPS |
0 |
|
ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
B. Each Additional 10 Floors Or Less |
0 |
|
BOILER CONTROLS |
0 |
|
OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
|
001 |
( 37) |
MOTOR DISCONNECT SWITCH HAS NOT BEEN PROVIDED (ALL FLOORS)NO DISC SW FOR AC,11 AIR HANDLERS,2 HOT WATER HEATERS,3 APPLIACSE BRCKTS AND OUTLETS PROVIDED 4 HANDLER UNIT-AC CONTROL WIRING RUN EXPOS |
RSLV |
08/05/2009 |
08/05/2009 |
11/12/2021 |
|
002 |
( 37) |
MOTOR DISCONNECT SWITCH HAS NOT BEEN PROVIDED (ALL FLOORS)NO DISC SW FOR ELEC.21 AIR HANDLERS,2 HOT WATERHEATER,3 APPLIANCE BR CKTS AND OUTLETS PROVIDED 4 HANDLER UNIT-AC CONTROL WIRING |
RSLV |
08/05/2009 |
08/05/2009 |
11/12/2021 |
|
003 |
(999) |
OTHER (ALL FLOORS)KITCHEN 3172.B NO 31 AIR HANDLER 2 HOT WATER HEATER 3 APPLIANCE BRCKTS AND OUTLETSN PROVIDED 4 HANDLER UNIT-AC CONTROL WIRING RUN EXPO |
RSLV |
08/05/2009 |
08/05/2009 |
11/12/2021 |
|
004 |
(999) |
OTHER (ALL FLOORS)AC COMPRESSOR AND AIR 41 AIR HANDLER 2 HOT WATER HEATER 3 APPLIACNEBR CKTS AND OUTLETS PROVIDED 4 HANDLER UNIT-AC CONTROL WIRING RUN EX |
RSLV |
08/05/2009 |
08/05/2009 |
11/12/2021 |