|
||
NYC Department of Buildings | ||
Electrical Application Details for App #: M293857 |
Premises: 54 EAST 4 STREET MANHATTAN | BIN: 1006571 Block: 459 Lot: 12 |
Application Completed and Certified |
Filed: | 54 E 4 ST | Census Tract: 38 | Health Area: 6500 | |
O/D | Admin Area: M - MANHATTAN | Inspection Area: T | ||
NEW YORK, NY 10003 | Community Board: 103 | |||
DOB Cross Street(s): BOWERY, 2 AVENUE | |||
Status: C - JOB IS SIGNED OFF 06/10/2014 | |||
Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 06/30/2009 12:59 PM | |
Application Entered: 06/30/2009 | Job Start Date: 08/05/2009 | ||
Last Change: 06/10/2014 | Job End Date: 10/05/2009 |
Appointment Status: | |||
Last Inspection By: KELLER, JONATHAN On 03/05/2014 | |||
Field Disp: C - INSPECTION PASSED | |||
Energize Recommendation: | |||
Objection Disposition: |
License #: | 011917 | Licensee Name: | ALTAF H SYED-NAQVI | |
Firm: | 003528 | Firm Name: | ALSON ELEC'L CONTR. INC | |
Firm Phone: | 718-435-1677 | Firm Address: | 1253 ROCKAWAY AVENUE BROOKLYN NY 11236 |
Work Started or Filed by Others: YES | ||||||||
Work Category: R - REHABILITATION | Work To Be Done:
W - SIDEWALK SHED WIRING & LIGHTING |
Total Fee: $40.00 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: |
Building Used As: Z - Other | |||||||
Store / Other: C7-WALK UP APTS | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: NOT APPLICABLE | |||||||
Owner / Occup: | LAKHWINDER SINGH | ||||||
Owner Business Name: | METRO CONTRACTING INC | ||||||
Authorized Representative: K ITWARIA | |||||||
Relationship To Owner: F. REPRESENTATIVE |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
SWK | 3 | 1 | ||||||||||
Buildings Total | 3 | 1 | ||||||||||
Total Units : 4 units |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
Power Auth Flag: | Objection Flag: | ||
Power Requested: | Notice: | ||
Power Issued: | Response: |
Follow-Up: | K - (CLOSED) | ||
Contractor's Comments: LIGHTS UNDER SIDE WALK SHED BRIDGE. 40 L.F. |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
(1) | 03/05/2014 | 03/10/2014 | JKE | C | (5) | (0) | Y | |||
INSPECTION COMMENTS: | SHED ABSENT |