| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
2 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
1 |
400A |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 6) |
FEEDER DIAGRAM DID NOT ACCOMPANY APPLICATION FOR INSPECTION ELECT SERV,NO FDR DIAG.(W/LOAD CALCS)FOR INSTALLATION OF NEW 400 AS/S (TRANS "S"),S.E.C.'S;FDRS;3/0 PNL |
RSLV |
02/05/2009 |
02/05/2009 |
05/05/2009 |
| |
| 002 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED 400A S/S NO NEUTRAL ENCLOSURE BONDING 400A S/S (TRANS "S") |
RSLV |
02/05/2009 |
02/05/2009 |
05/05/2009 |
| |
| 003 |
( 4) |
SERVICE IN EXCESS OF 1000KVA HAS NOT BEEN SUBMITTED FOR APPROVAL NO ADV.BD APPROV (CAL.#) FOR 400A S/S ADDITION BRINGING TOTAL AMPACITY OF SERVICE TO EXCEDE 1000KVA |
RSLV |
02/05/2009 |
02/05/2009 |
05/05/2009 |
| |
| 004 |
(999) |
OTHER 230.71 MORE THAN SIX SER SW IN USE TOTAL OF 8 S/S COUNTED IN USE WITH ELECTRICIAN & BLDG SUPT |
RSLV |
02/05/2009 |
02/05/2009 |
05/05/2009 |
| |
| 005 |
(999) |
OTHER SER.ROOM: 200A DIS SW NEUTRAL BONDED250.24A5 |
RSLV |
05/05/2009 |
09/29/2009 |
03/10/2010 |
| |
| 006 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED SER.ROOM: 400A S SWITCH NEUTRAL NOT BONDED (TRANS 'S') |
RSLV |
05/05/2009 |
05/05/2009 |
09/29/2009 |
| |
| 007 |
( 6) |
FEEDER DIAGRAM DID NOT ACCOMPANY APPLICATION FOR INSPECTION SER.ROOM: FEEDER NEED LOAD CALCS FOR NEW 400A SER SWITCH |
RSLV |
05/05/2009 |
09/29/2009 |
03/10/2010 |
| |
| 008 |
( 4) |
SERVICE IN EXCESS OF 1000KVA HAS NOT BEEN SUBMITTED FOR APPROVAL NO ADV BD APPROV (CAL #)FOR 400A S/S ADDITION BRINGING TOTAL AMPACITY OF SERVICE TO EXCEDE 1000KVA |
RSLV |
09/29/2009 |
09/29/2009 |
03/10/2010 |