BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M285711
Premises: 55 BATTERY PLACE MANHATTAN BIN: 1087945     Block: 16   Lot: 40
   

Filed: 55 BATTERY PL Census Tract:   317.01 Health Area:  8900
55 BATTERY PLACE Admin Area:   M - MANHATTAN Inspection Area:   R
NEW YORK, NY 10280 Community Board:   101
Related Job Number:    103878733
DOB Cross Street(s):    1 PLACE,    2 PLACE
Status:   K - CLOSED/CANCELLED 10/04/2010
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  10/07/2008 12:17 PM
Application Entered:   10/07/2008 Job Start Date:   10/07/2008
Last Change:   10/04/2010 Job End Date:   12/31/2010
Appointment Status:   
Last Inspection By:   BEST, J       On     09/25/2010      
Field Disp:   K - OK TO CANCEL
Energize Recommendation:  
Objection Disposition:  

License #: 011390 Licensee Name: KEVIN MCKOSKY
Firm: 003697 Firm Name: COASTAL ELEC CONSTR CORP
Firm Phone: 718-338-2304  Firm Address: 4502 AVENUE N BROOKLYN NY 11234 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
2 - TEMPORARY CONSTRUCTION
6 - GENERAL WIRING
T - TEMPORARY LIGHT & POWER
Total Fee:  $766.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   W - School
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: TIMOTHY MURPHY
Owner Business Name: DEMATTEIS CONSTRUCTION
Authorized Representative:  TIM MURPHY
Relationship To Owner:   GENERAL CONTRACTOR


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  1  800 AMP SERVICE SWITCH
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  2  2 SETS OF 500 MCM
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  2  100 AMP 3 PHASE
D. 3 Phase Over 225 AMPS  2  4 100 AMP 3 PH SWITCHES
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
001    20  10      20  15         
002    20  10      20             
003    20  10      20             
004    20  10      20             
005    20  10      20             
006    20  10      20             
007    20  10      20             
008    20  10      20             
Buildings Total 160  80      160     15           
Total Units : 415 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 1
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 10/07/2008 Notice:  
Power Issued: 10/07/2008 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  TEMPORARY SERVICE FOR CONSTRUCTION OF PS276

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M285711
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/25/2010 10/04/2010 JSB K (30) (0) Y
INSPECTION COMMENTS: TEMP REMOVED PRIOR TO INSP




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order