Electrical Application Details for App #: M283181
Premises: 80 5 AVENUE MANHATTAN BIN: 1009717     Block: 577   Lot: 39
   
Application Completed and Certified

Filed: 2 W 14 ST Census Tract:   63 Health Area:  5700
SUB BASEMENT Admin Area:   M - MANHATTAN Inspection Area:   S
NEW YORK, NY 10011 Community Board:   102
DOB Cross Street(s):    5 AVENUE,    AVENUE OF THE AMERICAS
Status:   C - JOB IS SIGNED OFF 04/09/2009
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/23/2008 2:44 PM
Application Entered:   07/23/2008 Job Start Date:   07/24/2008
Last Change:   04/09/2009 Job End Date:   07/24/2009
Appointment Status:   
Last Inspection By:   CHARLES COURTNEY       On     10/24/2008      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010864 Licensee Name: MARK P REILLY
Firm: 002209 Firm Name: ALL NU ELEC'L CONTR'G COR
Firm Phone: 646-759-3661  Firm Address: 165 BROADWAY, SUITE 2358,23FL NEW YORK NY 10006 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
Total Fee:  $55.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   K - Store
Store / Other:   RESTURANT
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ROB ROBELT
Owner Business Name: OWNER
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 1 #10-Wire 0
Existing Meters 0 + New Meters 1 - Removed Meters 0 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 07/23/2008 Notice:  
Power Issued: 07/23/2008 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M283181
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/24/2008 11/03/2008 CCH C (60) (0) Y
INSPECTION COMMENTS: CONTRACTOR NEEDS TO CANCEL THIS APPLICATION AND REFILE FOR WORK DONE