BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M281477
Premises: 6 MAIDEN LANE MANHATTAN BIN: 1079037     Block: 64   Lot: 15
   
Application Completed and Certified

Filed: 6 MAIDEN LANE Census Tract:   15.02 Health Area:  7700
* Admin Area:   M - MANHATTAN Inspection Area:   W
NEW YORK, NY 10038 Community Board:   101
DOB Cross Street(s):   BROADWAY,    LIBERTY PLACE
Status:   C - JOB IS SIGNED OFF 05/26/2009
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/06/2008 12:55 PM
Application Entered:   06/06/2008 Job Start Date:   09/01/2008
Last Change:   05/26/2009 Job End Date:   06/01/2009
Appointment Status:   
Last Inspection By:   CHARLES COURTNEY       On     05/18/2009      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011631 Licensee Name: EDWARD MAZIARZ
Firm: 003578 Firm Name: EJM ELECTRICAL CORP
Firm Phone: 718-625-3300  Firm Address: 45 MAIN STREET-SUITE 844 BROOKLYN NY 11201 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT
Total Fee:  $165.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   O - Office Bldg
Special Cert Approval:   L - FIRE ALARM LOCAL LAW #5
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: DAROR ASSOC/BRAUN MGMT
Authorized Representative:  NAT BRAUN
Relationship To Owner:   REPRESENTATIVE


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  1  125.00
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALL NEW ELEVATOR CONTROLS TO INCLUDE CONTROL WIRING, FIREWIRE INTERLOCKS AND OUTLETS ON CAR TOP ONLY. CAR PE5/1P1112

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M281477
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/18/2009 05/26/2009 CCH C (30) (0) Y
INSPECTION COMMENTS: CAR # 1P1112




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order