BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M261613
Premises: 67 EAST BROADWAY MANHATTAN BIN: 1003410     Block: 280   Lot: 27
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 71 E BROADWAY Census Tract:   8 Health Area:  7800
BASEMENT Admin Area:   M - MANHATTAN Inspection Area:   V
NEW YORK, NY 10002 Community Board:   103
DOB Cross Street(s):   CATHERINE STREET,    MARKET STREET
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   12/05/2006 Job Start Date:   11/15/2006
Last Change:   08/22/2025 Job End Date:   01/15/2007
Appointment Status:   
Last Inspection By:          On          
Field Disp:   
Energize Recommendation:  
Objection Disposition:  

License #: 009521 Licensee Name: GARY LEVINE
Firm: 000570 Firm Name: GARY ELECTRIC CORP.
Firm Phone: 718-388-2460  Firm Address: 87 GUERNSEY STREET BROOKLYN NY 11222 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $163.75
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   F - Factory
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: BUU LE LIEN
Owner Business Name: REALTY OF USA
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  1  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total              25           
Total Units : 25 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 1 #10-Wire 0
Existing Meters 0 + New Meters 1 - Removed Meters 0 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 12/05/2006 Notice:  
Power Issued: 12/05/2006 Response:  

Follow-Up:
Contractor's Comments:  NEW 25 HP FIRE PUMP

 
 

*NO INSPECTION RECORDS FOUND FOR ELECTRICAL APPLICATION NUMBER M261613
INSPECTION FOR APPLICATION #: M261613
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order