BIS Menu  |  Elevators  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M244225
Premises: 160 EAST 92 STREET MANHATTAN BIN: 1048309     Block: 1520   Lot: 45
   
Application Completed and Certified

Filed: 160 E 92 ST Census Tract:   158.01 Health Area:  2820
NONE Admin Area:   M - MANHATTAN Inspection Area:   J
NEW YORK, NY 10128 Community Board:   108
DOB Cross Street(s):   LEXINGTON AVENUE,    3 AVENUE
Status:   C - JOB IS SIGNED OFF 02/13/2007
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   04/12/2005 Job Start Date:   04/11/2005
Last Change:   02/13/2007 Job End Date:   06/11/2005
Appointment Status:   
Last Inspection By:   HINDS EUGENE       On     01/19/2007      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 011068 Licensee Name: CARLOS BERGER
Firm: 003535 Firm Name: BERGER QUALITY ELEC'L CON
Firm Phone: 718-768-3300  Firm Address: 195 7TH AVENUE BROOKLYN NY 11215 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $180.75
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   B - Two Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: FRAUD 92 PROPERTY LLC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  2  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 39  63    32  39                
Total Units : 173 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice: 1 - FIRST NOTICE 12/05/2006
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M244225
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 08/04/2006 08/09/2006 JSB J (45) (0) Y
INSPECTION COMMENTS: BRANCH CKT WIRING NOT COMPLETE
 
(2) 11/29/2006 12/05/2006 EHD A (30) (1) Y
INSPECTION COMMENTS: SEE VIOLATION DETAILS
 
(3) 01/19/2007 01/30/2007 EHD C R (20) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Elevators  |  Electrical Inspection Work Order  |  Back