|
||
NYC Department of Buildings | ||
Electrical Application Details for App #: M229509 |
Premises: 313 WEST 35 STREET MANHATTAN | BIN: 1013574 Block: 759 Lot: 31 |
DOB NOW: Inspections | |||||||||||
Application Completed and Certified |
Filed: | 315 W 35 ST | Census Tract: 111 | Health Area: 5500 | |
ELEVATOR | Admin Area: M - MANHATTAN | Inspection Area: Q | ||
NEW YORK, NY 10001 | Community Board: 104 | |||
DOB Cross Street(s): 8 AVENUE, 9 AVENUE | |||
Status: C - JOB IS SIGNED OFF 11/30/2021 | Balance Paid By Owner | ||
Request Type: A - APPLICATION | eFiled: NO | ||
Application Entered: 12/15/2003 | Job Start Date: 12/07/2003 | ||
Last Change: 11/30/2021 | Job End Date: 03/15/2004 |
Appointment Status: | |||
Last Inspection By: SAMIR BASILLI On 11/12/2021 | |||
Field Disp: C - INSPECTION PASSED | |||
Energize Recommendation: | |||
Objection Disposition: R - REMOVED |
License #: | 011538 | Licensee Name: | NICHOLAS BLASONE | |
Firm: | 003044 | Firm Name: | NEW CENTURY ELEC'L CONTR | |
Firm Phone: | 718-441-7123 | Firm Address: | 105-15 JAMAICA AVE INC. QUEENS NY 11418 |
Work Started or Filed by Others: NO | ||||||||
Work Category: R - REHABILITATION | Work To Be Done:
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT 6 - GENERAL WIRING |
Total Fee: $477.00 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: |
Building Used As: Z - Other | |||||||
Store / Other: LOFT | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: | |||||||
Owner / Occup: | NAHAMIOS K ALBERT | ||||||
Owner Business Name: | MARGAB, LLC | ||||||
Authorized Representative: | |||||||
Relationship To Owner: |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
Buildings Total | 4 | 4 | 4 | 4 | 28 | 50 | ||||||
Total Units : 94 units |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
Power Auth Flag: | Objection Flag: | ||
Power Requested: | Notice: | 1 - FIRST NOTICE 07/20/2021 | |
Power Issued: | Response: |
Follow-Up: | K - (CLOSED) | ||
Contractor's Comments: |
|