NYC Department of Buildings
Electrical Application Details for App #: M229139
Premises: 146 ORCHARD STREET MANHATTAN BIN: 1005340     Block: 411   Lot: 1
   
Application Completed and Certified

Filed: 146 ORCHARD ST Census Tract:   30.01 Health Area:  6600
BASEMENT-6TH FLOOR Admin Area:   M - MANHATTAN Inspection Area:   T
NEW YORK, NY 10002 Community Board:   103
DOB Cross Street(s):   RIVINGTON STREET,    STANTON STREET
Status:   C - JOB IS SIGNED OFF 07/05/2007
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   12/03/2003 Job Start Date:   02/10/2004
Last Change:   07/05/2007 Job End Date:   12/10/2004
Appointment Status:   
Last Inspection By:   MCKENZIE, W.       On     06/27/2007      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 009279 Licensee Name: JOSEPH P TUZZOLO
Firm: 001985 Firm Name: TAFT ELECTRIC CO. INC.
Firm Phone: 718-858-1573  Firm Address: 65 SAINT FELIX STREET BROOKLYN NY 11217 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
8 - BOILER/BURNER WIRING
Total Fee:  $1,354.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   COMMERCIAL/RESIDENT
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: SION MISRAHI
Owner Business Name: SUSHELL CORP
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  1  800A
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  16  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  2  2 500MCM
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  18  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  3  100A
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 232  428  20  208  232              
Total Units : 1127 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 21 #4-Wire 1 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 12/03/2003 Notice:  
Power Issued: 12/03/2003 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M229139
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/27/2007 06/29/2007 WMK C E (40) (0) Y
INSPECTION COMMENTS: WIRED TO GAS FIRE HOT WATER BOILERS