BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M226469
Premises: 108 EAST 87 STREET MANHATTAN BIN: 1047972     Block: 1515   Lot: 7501
  Printable (PDF) version of this Permit  

Filed: 110 E 87 ST Census Tract:   148.02 Health Area:  3600
2F Admin Area:   M - MANHATTAN Inspection Area:   J
NEW YORK, NY 10128 Community Board:   108
DOB Cross Street(s):   PARK AVENUE,    LEXINGTON AVENUE
Status:   I - AWAITING INSPECTION REQUEST
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   09/02/2003 Job Start Date:   07/16/2003
Last Change:   09/02/2003 Job End Date:   08/15/2003
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:          On          
Field Disp:   
Energize Recommendation:  
Objection Disposition:  

License #: 009849 Licensee Name: CHAIM WRUBEL
Firm: 000678 Firm Name: HY-LEE ELECTRIC CO., INC.
Firm Phone: 718-886-1913  Firm Address: 14-34 110TH STREET SUITE 102 COLLEGE POINT NY 11356 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $55.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: KATHY NEMETH
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                   
Total Units : 9 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up:
Contractor's Comments:  REPL FUSE BOX IN A CIR BRKER BOX FIVE APPLIANCE OUTLETS-NOADDITIONAL POWER

 
 

*NO INSPECTION RECORDS FOUND FOR ELECTRICAL APPLICATION NUMBER M226469
INSPECTION FOR APPLICATION #: M226469
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order