Electrical Application Details for App #: M221910
Premises: 211 WEST 18 STREET MANHATTAN BIN: 1086359     Block: 768   Lot: 29
   

Filed: 211 W 18 ST Census Tract:   87 Health Area:  5600
NONE Admin Area:   M - MANHATTAN Inspection Area:   R
NEW YORK, NY 10011 Community Board:   104
DOB Cross Street(s):    7 AVENUE,    8 AVENUE
Status:   K - CLOSED/CANCELLED 10/07/2004
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   04/03/2003 Job Start Date:   01/24/2003
Last Change:   10/07/2004 Job End Date:   01/24/2003
Appointment Status:   
Last Inspection By:   PELUSO, RICHARD       On     10/06/2004      
Field Disp:   K - OK TO CANCEL
Energize Recommendation:  
Objection Disposition:  

License #: 011078 Licensee Name: EUGENE FITZGERALD
Firm: 002446 Firm Name: E. FITZGERALD ELEC CO INC
Firm Phone: 718-945-6828  Firm Address: 633 3RD AVE 17 FLOOR STE 1731 NEW YORK NY 10017 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
2 - TEMPORARY CONSTRUCTION
Total Fee:  $40.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   SIDEWALK
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: COLGATE SCAFFOLD
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                       
Total Units : 7 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M221910
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/06/2004 10/07/2004 RPL K (15) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application